My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Marriott Hotel Site Development at Hall of Fame, Phase 3 Project No. 117-064 - HRP Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Marriott Hotel Site Development at Hall of Fame, Phase 3 Project No. 117-064 - HRP Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 9:45:47 AM
Creation date
8/23/2017 1:13:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/22/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
State <br />Barricading <br />Inc <br />`The Road To Success Is Always Under Construction' <br />24963 US 20 West <br />South Bend, Indiana, 46628 <br />Phone., 574 287 2078 <br />Fax: 574 287-1744 <br />Qty <br />1.5 Month <br />1 Month <br />2.5 Month <br />Item # : Description <br />I Maintaining Traffic For Part A- <br />Includes 1 Construction Sign A <br />(RCA), 12 Drums & Initial <br />Delivery/Final Pick Up For <br />Approximately 45 Calendar <br />Days <br />IMaintaining Traffic For Part 8- <br />1 Includes 1 Construction Sign A <br />(RCA), 25 Drums & initial <br />1 Dellvery/Final Pick Up For <br />Approximately 30 Calendar <br />? Days <br />i <br />Maintaining Traffic For Part C- <br />Includes 2 Construction Sign A <br />(RCA), 30 Drums, 4 Type III <br />Barricades W/ Signs & Initial <br />Delivery/Final Pick Up For <br />Approximately 75 Calendar <br />Days <br />Lane Closure On Martin Luther <br />King Drive, If Needed- 11 Day <br />+ EAO <br />'*'Any Equipment Needed <br />Past Initial Quoted Period <br />Subject To Additional Charge. <br />Price For Parts A,B & C <br />Remains The Same If All <br />Phases Are Required To Run <br />Simultaneously Or <br />Concurrently***. <br />1" Day-$289.00 <br />Each Additional <br />bay-$55.00 <br />Quote <br />Date: 8/17/2017 <br />,fob Marriot Hotel Site <br />Development @ Hail Of <br />Fame (Phase 3) <br />TO HRP Construction <br />LineuTotal <br />$379.00 <br />$490.00 <br />$1,882.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.