My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Marriott Hotel Site Development at Hall of Fame, Phase 3 Project No. 117-064 - HRP Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Marriott Hotel Site Development at Hall of Fame, Phase 3 Project No. 117-064 - HRP Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 9:45:47 AM
Creation date
8/23/2017 1:13:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/22/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL CONDITIONS <br />Concerning the Attached Quotation <br />Quote Number: Marriott <br />STANDARD NOTATIONS: <br />1, Special note concerning seeding: Slusser's will install seed year-round. However, we will not guarantee <br />seeding performed May 15th through August 15th, and October 1 through March 1. Seeding during this <br />period is very risky due to extreme climatic conditions (heat/drought/coldletc.) This note does not apply <br />to prairie or wetland seeding unless specified otherwise. <br />2. This quote is valid for a period of 60 days, <br />3. Lawn maintenance to include watering, mowing or spraying are not Included In this quotation. <br />A. 'Topsoil, lops9il placement and any necessary amendments are not included in this quotation. <br />5. Quantities on this quotation are approximate, Areas will be measured and invoiced per unit prices. <br />6. Performance & Payment bonds are available but not included in this quotation. <br />7. Removal of rocks, debris and existing vegetation is not included in this quotation. <br />8. Seeding or sodding off right-of-way or outside of the construction limits Is not included in this quotation. <br />9. Supplying or installing topsoil, planting soil mix, or subsoil is not included in this quotation. <br />10. Inorganic and Organic soil amendments are not Included In this quotation. <br />11. Price for Landscaping Includes plants, installation, staking, mulch and one year warranty. <br />12. Supplying or installing tree grates Is not Included in this quotation, <br />13. Sodding, Nursery price does not include supplying or installing topsoil, ground preparation, or notching. <br />14. Sodding, Nursery price Includes supplying and Installing 100% Kentucky Bluegrass variety and watering <br />for 30 days only. <br />15. Optional ground prep for sodding price does not Include topsoil, topsoil placement, grading, or removal <br />of existing vegetation. <br />16. Optional ground prep for sodding price Includes sod notching, fine raking, knocking down dirt clods, and <br />removal of rocks only, <br />17. Clearing, grubbing, grading, or removal of existing vegetation or landscaping is not included in this quotation <br />18. Supplying or installing electrical outlets at trees is not Included In this quotation. <br />19. Weed barrier is not Included in this quotation. <br />20, supplying or installing Lily Turf Is not included in this quotation. <br />21. Supplying or installing pavers Is not included In this quotation. <br />22. Traffic control is the responsibility of the contractor/owner. <br />23, Indiana State Sales Tax has not been included In pricing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.