My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 14 - WWTP Secondary Treatment Improvements Project No. 114-053 - Thieneman Construction Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 14 - WWTP Secondary Treatment Improvements Project No. 114-053 - Thieneman Construction Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:56:11 PM
Creation date
8/23/2017 12:57:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/22/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />WWTP SECONDARY TREATMENT IMPROVEMENTS <br />CITY PROJECT NO. 114-053 <br />CHANGE ORDER PROPOSAL <br />Change Order Proposal No.: 114-053-057.4 Date: 8/7117 <br />Submitted in Response to Proposal Request No.: <br />Contract Name and No.: 114-053 South Bend WWTP Secondat Treatment lm )rovements <br />Contractor: Thieneman Construction Inc. <br />Subject: Per the revised detail from Areadis as related to the response to RFl #116, the location <br />of the temporary stop plate limits the width of the concrete curb at the bottom of the channel to <br />9". As directed, this proposal excludes adding a small concrete kneewall at the top east side on <br />the slide gate to prevent water from simply going around the gate. Subsequent-to-eu+--Mi elr-lfil <br />lit the • ast },aie: Revised as <br />requested per Aracadis's email dated 5/22/17. <br />The following changes to the Contract are proposed: <br />SCOPE OF WORK: (attach and li.si supporting information as required) <br />1. Item: TCI -- See attached cost breakdown - $3,344.00 <br />JUSTIFICATION: <br />1. Item. Owner Request <br />CHANGES IN CONTRACT PRICE AND CONTRACT TIMES: <br />We propose that the Contract Price and Contract Times be changed as follows: <br />For Contract Price, when requested by Engineer, attach detailed cost breakdowns for Contractor and <br />Subcontractors, Supplier quotations, and other information required. <br />For the Contract Times, state increase, decrease, or no change to Contract Times for Subsianital Completion, <br />readiness for final payment, and Milestones, if any. If increase or decrease, state specific number of days for <br />changes to the Contract Times. <br />Descrti©n <br />Amount <br />Contract Times (days) <br />Substantial <br />Final <br />1. Item - TCI _ <br />$3,344.00 <br />0 <br />0 <br />2. Item - TCI - M15% TO <br />Total This Change Orden Proposal <br />$502.00 <br />S3,846.00 <br />0 <br />0 <br />0 <br />0 <br />Changes <br />to <br />Milestones, <br />fra <br />any: <br />The adjustment proposed is the entire adjustment to ie�Contract to which the proposer believes it <br />is entitled as a result of the proposed change, <br />Change Order Proposal By: Crai � S� teele <br />Signature of Proposer: <br />
The URL can be used to link to this page
Your browser does not support the video tag.