Laserfiche WebLink
1JXI)C'EP <br />11;(:'EiEl Ptti 3li'::1 f; t',^;;tU<CI <br />' 1>�ii'.'.r•,�I NIS E:iIr',\��'ll'E. <br />Change Order No. 14 <br />Date of Issuance: August 9, 2017 Effective Date: <br />Owner: City of South Bend Owner's Contract No.: 114-053 <br />Contractor: Thienernan Construction Contractor's Project No.: <br />Engineer: Areadis US Engineer's Project No.: 03029034.0000 <br />Project: Secondary Treatment Improvements Contract Name: <br />The Contract is modified as follows upon execution of this Change Order: <br />COP 57 R4 — Slide Gate Extension................................................................................................... $3,846.00 <br />COP 66 R2 — Junction Box E Cover Plate......................................................... <br />............................... . $3,486.00 <br />COP 78 R1 Remove Fillets for Stop Logs...................................................................................... <br />$4,409.00 <br />COP 80 — RAS Channel Cleanout..................................................................................................... <br />$4,272.00 <br />COP 81—West Entrance Culvert Replacement............................................................................... <br />$5,505.00 <br />COP 82 R1-- Swap hatches for HS-20.............................................................................................. <br />$3,855.00 <br />COP 83 R1— Repair 2-in comm cable.............................................................................................. <br />$2,996.00 <br />COP 84—Additional Asphalt Drive Overlay.....................................................................................$5,625.00 <br />COP 85 — Unforseen Demo at C4 and C5 Gates............................................................................. <br />.$381.00 <br />COP 86—Sludge Removal RAS Channel Phase G2........................................................................$25,514.00 <br />COP 87 —Water Line Abandonment, East of Aeration................................................................... <br />$5,489.00 <br />Unused Unit Price Quantity Deductions, See Attached <br />............................................................($131,867A0) <br />Attachments: Contractor's Change Order Proposals <br />CHANGE IN CONTRACT PRICE <br />CHANGE IN CONTRACT TIMES <br />Original Contract Price: <br />Original Contract Times: <br />Substantial Completion: July 26, 2017 <br />$ 11,885,000.00 <br />Ready for Final Payment: August 25,_ 2017 <br />Increase from previously approved Change Orders: <br />Increase from previously approved Change Orders: <br />Substantial Completion: 225 <br />days <br />$ 2,103,104.87 <br />Ready for Final Payment: 225 <br />days <br />Contract Price prior to this Change Order: <br />Contract Times prior to this Change Order: <br />Substantial Completion: March 8, 2018 <br />$ 13 988 104.87 <br />Ready for Final Payment: Aril 7 2018 <br />Increase of this Change Order: <br />Increase of this Change Order: <br />Substantial Completion: 0 <br />days <br />$ (66,489.40) <br />Ready for Final Payment: 0 <br />days <br />Contract Price incorporating this Change Order: <br />Contract Times with all approved Change Orders: <br />Substantial Completion: March 8, 2018 <br />$ 13 921 615.47 <br />Ready for Final Payment: Aril 2L 208 <br />R END D: i <br />Engineer (if required) <br />Title: AOJr <br />Date: Q� a <br />ACCEPTED: <br />By: , ' By: <br />Owner (Authorized Signature) <br />Title lAt"dTitle <br />Date p$ - /7. Zo/7 Date <br />X"daVC ' 7b APPXvvA_ AY <br />C-'" of Savlw $ PO <br />&~ oie Ltd" C "Ot K ' <br />ACCZ <br />Contract (Authorized Signature) <br />EJCDC" C-941, Change Order. <br />Prepared and published 2013 by the Engineers Joint Contract Documents Committee. <br />Page 1 of 2 <br />