Laserfiche WebLink
Division B <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LS <br />$5,500.00 <br />$5,500.00 <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LS <br />$6,860.00 <br />$6,860.00 <br />3 <br />MILLING, VARIES 1.5 TO 2.5 INCHES <br />6540 <br />SY <br />$2.60 <br />$17,004.00 <br />4 <br />HMA SURFACE, 9.5 MM -TYPE B <br />540 <br />TONS <br />$76.00 <br />$41,040.00 <br />5 <br />HMA WEDGE AND COVER - TYPE B <br />33 <br />TONS <br />$175.00 <br />$5,775.00 <br />6 <br />TACK COAT <br />6 <br />TONS <br />$1.00 <br />$6.00 <br />7 <br />JOINT ADHESIVE SURFACE <br />4620 <br />LF <br />$0.60 <br />$2,772.00 <br />8 <br />ADJUST MANHOLE TO GRADE <br />5 <br />EA <br />$550.00 <br />$2,750.00 <br />9 <br />ADJUST WATER LINE STRUCTURE TO GRADE <br />2 <br />EA <br />$405.00 <br />$810.00 <br />10 <br />WIRELESS VEHICLE DETECTION SYSTEM <br />21 <br />EA <br />$400.00 <br />$8,400.00 <br />11 <br />PAVEMENT MESSAGE MARKINGS, THERMOPLASTIC, WHITE, <br />TURN ARROW <br />11 <br />EA <br />$90.00 <br />$990.00 <br />12 <br />PAVEMENT MESSAGE MARKING, THERMOPLASTIC, WHITE, <br />"ONLY" <br />5 <br />EA <br />$125.00 <br />$625.00 <br />13 <br />LINE, THERMOPLASTIC, STOP LINE, SOLID, WHITE, 24 INCHES <br />96 <br />LF <br />$5.90 <br />$566.40 <br />14 <br />LINE, THERMOPLASTIC, SOLID, WHITE, 4 INCHES <br />604 <br />LF <br />$0.89 <br />$537.56 <br />15 <br />LINE, THERMOPLASTIC, SOLID, YELLOW, 4 INCHES <br />2136 <br />LF <br />$0.74 <br />$1,580.64 <br />16 <br />LINE, THERMOPLASTIC, BROKEN, YELLOW, 4 INCHES <br />128 <br />LF <br />$0.89 <br />$113.92 <br />17 <br />LINE, THERMOPLASTIC, BROKEN, WHITE, 4 INCHES <br />529 <br />LF <br />$0.$9 <br />$470.81 <br />18 <br />TRANSVERSE MARKING, THERMOPLASTIC, CROSSWALK, WHITE, <br />241NCHES <br />168 <br />LF <br />$6.50 <br />$1,092.00 <br />19 <br />TRANSVERSE MARKING, THERMOPLASTIC, CROSSWALK, WHITE, <br />6INCHES <br />221 <br />LF <br />$2.10 <br />$464.10 <br />20 <br />PAVEMENT GROOVING FOR 4-INCH THERMOPLASTIC LINES <br />3397 1 <br />LF <br />$1,00 <br />$3,397.00 <br />DIVISION B TOTAL: $100,754.43 <br />Version 3/20/2017 Contractor's Bid for Public Works - 0 <br />