My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Arcadis US, Inc. - Design & Construction Administration for the Wastewater Headworks Influent Gates Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Arcadis US, Inc. - Design & Construction Administration for the Wastewater Headworks Influent Gates Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:22:59 AM
Creation date
8/9/2017 3:10:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENVIRONMENTAL SERVICES <br />TO: Members of the Board of Public Works <br />Eric Horvath, Director of Public Works <br />Michael Schmidt, Assistant City Attorney Public Works <br />Linda M. Martin, Clerk <br />FROM: Al Greek, Director of Utilities <br />Jacob M. Klosinski, P.E., Assistant City Engineer <br />SUBJECT: Project No. 117-026 WWTP Headworks Influent Gates Improvements <br />Professional Services Agreement <br />DATE: August 1, 2017 <br />The Division of Utilities recommends the Board of Public Works approval of a Professional <br />Services Agreement with Arcadis U.S. for design and construction administration services for <br />Project No. 117-026 WWTP Headworks Influent Gates Improvements. <br />Background <br />The Department of Public Works engaged Donohue & Associates to provide an Influent Gates <br />Study earlier this year as a means to better understand flow control and our ability to service existing <br />flow meter equipment at the influent gates of the Wastewater Treatment Plant and control incoming <br />flow to the facility. <br />The resulting study recommended three to four gates inside the Wastewater Treatment Plant <br />with two gates at Junction Chamber No. 1 and one to two gates at Junction Chamber No. 2. <br />Controlling flow at the Wastewater Treatment Plant is one of the most important components to <br />exceptional and efficient treatment. <br />Scope of Services <br />The purpose of this Professional Services Agreement with Arcadis U.S. is to provide design <br />services for electrically actuated cast iron influent gates, electrical design, construction sequencing <br />and bypass pumping plan for between 50 MGD to 77 MGD. Arcadis will also provide Bidding <br />Services and Construction Administration Services during the project. <br />The total cost for the Professional Services is $105,720.00 (not to exceed). Refer to the <br />Professional Services Agreement for details on the scope of services and deliverables. <br />The Division of Utilities will appropriate sufficient funds from Utilities, Wastewater, Engineering, <br />Account (641-0630-793-31-02. <br />For questions regarding the subject agenda request and recommendations, contact Al Greek <br />(Ext. 4210) or Jacob M. Klosinski (Ext. 9496) at the Division of Utilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.