My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - River Walk Subdivision Street Lighting - TGB Unlimited dba ST Bancroft Electric
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Opening of Quotations - River Walk Subdivision Street Lighting - TGB Unlimited dba ST Bancroft Electric
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 1:52:33 PM
Creation date
8/9/2017 3:07:00 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
QUOTE/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME River Walk Subdivision Street Fighting <br />PROJECT NUMBER 117-080 <br />QUOTES DUE August 8, 2017 <br />Base <br />Quote <br />Item <br />No. <br />I Description <br />lQuanfitylUnit <br />I Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />L5 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />300.00 <br />3. <br />2" PVC Schedule 80 for Lighting with Pull Rope <br />4,220 <br />LFT <br />4. <br />Lighting Handhole <br />4 <br />EA <br />5. <br />Light Pole Foundation <br />19 <br />EA <br />600.00 <br />11 400.00 <br />6, <br />TESCO Cabinet <br />1 <br />EA <br />6.300-001 <br />M <br />MOM <br />7, <br />P-1 Foundation <br />1 <br />EA <br />600.00 <br />600.00 <br />8. <br />IMIscellaneous Equipment for Lighting <br />1 <br />LS <br />000.00 <br />1000.00 <br />Total Amount of Base Bid (Items I through 8) <br />Add Alternate A: tnstali Circuit A <br />47.9 <br />Item <br />No. <br />I Description lQuantitylUnit <br />Unit Price <br />Total Amount <br />Al. <br />4.1/c No. 4 Copper Cable <br />1,311 <br />LIFT <br />5,00 <br />6,555.00 <br />A2. <br />Light Pole and Luminalre, LED, Install <br />a <br />EA <br />200.00-1 <br />1,600,00 <br />A1 <br />Miscellaneous Equipment for Lighting <br />1 <br />LS <br />300.00 <br />300.00 <br />Total Amount of Add Alternate A (Items Al through A3) <br />19 41SIS nil <br />Add Alternate B: Install Circuit B <br />Item <br />No. <br />Description <br />lQuantitylAEAO <br />rice <br />Total Amount <br />B1. <br />4-11c No. 4 Copper Cable <br />894 <br />4 47p.00 <br />62. <br />Light Pole and Luminaire, LED, Install <br />3 <br />00 <br />600.00 <br />llaneous Equipment for Lighting <br />1 <br />00 <br />300.00 <br />Total Amount of Add Alternate B (Items B1 through B3)370 <br />Version 10/18/2016 Page - 13 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.