Laserfiche WebLink
Change Order No. 01 <br />Fellows Streetscape, Phase iI <br />Project No. 116-041B <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS: <br />Bid/Proposal Form: <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />No. <br />16 <br />TEMPORARY APPROACH <br />100 <br />TON <br />$50.00 <br />$5,000 <br />SPECIFICATIONS: <br />The following special provisions have been amended or added to the Contract Documents and are issued <br />as part of this Change Order: <br />xxxvlll. TEMPORARY APPROACH <br />A. Prevailing Specifications: 2016, INDOT Standard Specifications Section 205 <br />B. Additions <br />1. The Contractor shall construct a temporary approach immediately after removal of an <br />approach that is to be replaced and maintain such approach until a new approach has been <br />constructed. No property with an approach shall be without a temporary or new approach <br />between 5 pm and 8 am. <br />2. A temporary approach shall match INDOT's definition of a temporary stable construction <br />entrance. It is a sediment control measure consisting of a stabilized aggregate pad over <br />geotextile. See INDOT Standard Drawing E 205-TECP-01 for details. <br />3. Payment shall be made at the Unit Price specified in the Proposal as follows: <br />TEMPORARY APPROACH ................... TON <br />DRAWINGS: <br />The following sheets have been revised and are issued as new sheets as a part of this Change Order: <br />NO CHANGE <br />END CHANGE ORDER 1 <br />Page 2 of 2 <br />