My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 - Fellows Streetscape, Phase II Project No 116-041B - Walsh & Kelly Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 1 - Fellows Streetscape, Phase II Project No 116-041B - Walsh & Kelly Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:36:00 PM
Creation date
8/9/2017 2:26:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 01 <br />Fellows Streetscape, Phase iI <br />Project No. 116-041B <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS: <br />Bid/Proposal Form: <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />No. <br />16 <br />TEMPORARY APPROACH <br />100 <br />TON <br />$50.00 <br />$5,000 <br />SPECIFICATIONS: <br />The following special provisions have been amended or added to the Contract Documents and are issued <br />as part of this Change Order: <br />xxxvlll. TEMPORARY APPROACH <br />A. Prevailing Specifications: 2016, INDOT Standard Specifications Section 205 <br />B. Additions <br />1. The Contractor shall construct a temporary approach immediately after removal of an <br />approach that is to be replaced and maintain such approach until a new approach has been <br />constructed. No property with an approach shall be without a temporary or new approach <br />between 5 pm and 8 am. <br />2. A temporary approach shall match INDOT's definition of a temporary stable construction <br />entrance. It is a sediment control measure consisting of a stabilized aggregate pad over <br />geotextile. See INDOT Standard Drawing E 205-TECP-01 for details. <br />3. Payment shall be made at the Unit Price specified in the Proposal as follows: <br />TEMPORARY APPROACH ................... TON <br />DRAWINGS: <br />The following sheets have been revised and are issued as new sheets as a part of this Change Order: <br />NO CHANGE <br />END CHANGE ORDER 1 <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.