My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Newman Center Site Development - Project No 117-060R - HRP Construction and Robert Henry Corp
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Award Bids
>
Award Bid - Newman Center Site Development - Project No 117-060R - HRP Construction and Robert Henry Corp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 1:28:47 PM
Creation date
8/9/2017 2:19:15 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
THE R OBER T HENRY CORPORATION <br />General and Utility Contractors <br />Rich Estes <br />City of South Bend <br />Board of Public Work <br />1316 County -City Building <br />South Bend, Indiana 46601 <br />Re: Nervnian Center Site Development, Project No.]]7--0b0R <br />Mr. Estes, <br />Per your request regarding our bid for the above referenced project we would like to make the <br />following clarifications to our bid. <br />1. We would like to clarify the following line items; <br />a. Division A, Line &, Common Excavation — Our bid amount indicates a lump sum bid <br />amount of $33,000. That lump sum bid amount should have been 550cys at a unit <br />price of $60.00. <br />b. Division A, Line 21, Water Tapping Fee -- That line item is indicates a zero dollar <br />unit price as that cost in included in Line 20, Water Service (domestic). <br />c. Division A, Line 22, Fire Protection Lead -In — That line item indicates a zero dollar <br />unit price as that cost is included in Line 19, Water Service (fire) <br />d. Division A, Line 23, Corporation Stop — That line item indicates a zero dollar unit <br />price as that cost is included in Line 19, Water Service (fire) <br />e. Division A, Line 24, Tee, 16 x16in. ---- That line item indicates a zero dollar unit price <br />as that cost is included in Line 19, Water Service (fire) <br />f. Division A, Line 25, Gate Valve 6in. — That line item indicates a zero dollar unit <br />price as that cost is included in Line 19, Water Service (fire) <br />g. Division B, Line 9, Common Excavation. -- That line item indicates a lump sum bid <br />amount of $17,920. That lump sum bid amount should have been 112cys at a unit <br />price of $160. <br />h. Division C, Line 9, Common Excavation. — That line item indicates a lump sum bid <br />amount of $15,240. That lump sum bid amount should have been 120cys at a unit <br />price of $127. <br />Thanks for your patience, and we look forward to working with you on this project. If there is <br />anything else I can assist with please let me know. <br />Respectfully submitted, <br />The Robert Henry Corporation <br />Ron G. Perry <br />Project Manager <br />404 South Frances Street • P.O. Box 1407 South Bend, Indiana 46624 <br />www.roberthenrycorp.com • Tel. 574-232-2091 • Fax 574-232-3979 <br />
The URL can be used to link to this page
Your browser does not support the video tag.