Laserfiche WebLink
4.�IS!lg8n <br />Post, Square, Type 2, Reinforced Anchor Base <br />20 <br />LF <br />$37.50 <br />$750.00 <br />P45. <br />n, Sheet With Legend 0.080in. <br />3 <br />SFT <br />$75.00 <br />$225.00 <br />DIVISION A TOTAL $299,310.20 <br />DIVISION B: SAMPLE STREET AND EDDY STREET IMPROVEMENTS <br />Item <br />No. <br />Description <br />p <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />$1,963.00 <br />$1,963.00 <br />2. <br />Mobilization and Demobilization <br />1 <br />LS <br />$2,943.00 <br />$2,943.00 <br />3. <br />Video record <br />1 <br />LS <br />$728.00 <br />$728.00 <br />4. <br />Maintaining Traffic <br />1 <br />LS <br />$390.00 <br />$390.00 <br />5. <br />j Inspection Hole <br />4 <br />EA <br />$624.61 <br />$2,498.44 <br />6. <br />Clear Right of Way <br />1 <br />LS <br />$1,320.00 <br />$1,320.00 <br />7. <br />Sign, Remove & Relocate <br />3 <br />EA <br />$200.00 <br />$600.00 <br />8. <br />Pavement Removal <br />408 <br />SYS <br />$15.53 <br />$6,336.24 <br />9. <br />Common Excavation <br />1 <br />LS <br />$17,920.00 <br />$17,920.00 <br />10. <br />Curb, Concrete, Remove <br />430 <br />LF <br />$8.28 <br />$3,560.40 <br />11. <br />Temporary Erosion Control <br />1 <br />LS <br />$0.00 <br />12. <br />Temporary Silt Fence <br />326 <br />LF <br />$3.00 <br />$978.00 <br />13. <br />Temporary Inlet/Outlet Protection <br />3 <br />EA <br />$191.71 <br />$575.13 <br />14. <br />Compacted Aggregate, No. 53, Base <br />25 <br />TON <br />$68.40 <br />$1,710.00 <br />15. <br />HMA for Patching, Type A <br />7 <br />TON <br />$308.00 <br />$2,156.00 <br />16. <br />HMA for Right of Way, Full Depth <br />96 <br />SYS <br />$105.38 <br />$10,116.48 <br />17. <br />HMA Wedge and Level, Type A <br />86 <br />TON <br />$137.92 <br />$11,861.12 <br />18. <br />Curb and Gutter, Type B <br />126 <br />LF <br />$38.48 <br />$4,848.48 <br />19. <br />Standard Curb <br />333 <br />LF <br />$31.12 <br />$10,362.96 <br />20. <br />Concrete Sidewalk <br />332 <br />SYS <br />$70.31 <br />$23,342.92 <br />21. <br />Concrete Curb Ramp <br />37 <br />SYS <br />$197.00 <br />$7,289.00 <br />22. <br />Seeding and Sod <br />161 <br />SYS <br />$28.75 <br />$4,628.75 <br />23. <br />Line, Thermoplastic, Crosswwalk, 6in, <br />89 <br />LF <br />$2.75 <br />$244.75 <br />24. <br />Line, Thermoplastic, Stop Bar, 241n. <br />11 <br />LF <br />$9.60 <br />$105.60 <br />25. <br />Line, Thermoplastic, Solid Yellow, 4in. <br />590 <br />LF <br />$0.95 <br />$560.50 <br />26. <br />Sign Post, Square, Type 2, Reinforced Achor Base <br />20 <br />LF <br />$37.50 <br />$750.00 <br />27. <br />Sign, Sheet With Legend 0.080in. <br />9.8 <br />SIFT <br />$75.00 <br />$735.00 <br />28. <br />Line, Thermoplastic, Solid, White, 4in. <br />600 <br />LF <br />$0.95 <br />$570.00 <br />29. <br />Line, Thermoplastic, Solid, Blue, 4in. <br />20 <br />LF <br />$5.00 <br />$100.00 <br />30. <br />Pavement Message Marking, Thermoplastic, <br />1 <br />EA <br />$290.00 <br />$290.00 <br />31. <br />Pavement Message Marking, Thermoplastic, No <br />1 <br />EA <br />$290.00 <br />$290.00 <br />DIVISION B TOTAL $119,773.77 <br />DIVISION C: EDDY STREET AND BEYER AVENUE IMPROVEMENTS <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />$1,000.00 <br />$1,000.00 <br />2. <br />Mobilization and Demobilization <br />1 <br />LS <br />$3,248.00 <br />$3,248.00 <br />3. <br />Video record <br />1 <br />LS <br />$728.00 <br />$728.00 <br />4. <br />Maintaining Traffic <br />1 <br />LS <br />$390.00 <br />$390.00 <br />5. <br />Inspection Hale <br />4 <br />EA <br />$625.00 <br />$2,500.00 <br />6. <br />Clear Right of Way <br />1 <br />LS <br />$1,320.00 <br />$1,320.00 <br />7. <br />Sign, Remove, Relocate <br />2 <br />EA <br />$100.00 <br />$200.00 <br />