My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 2 to PSA - Arcadis US, Inc. - Construction Administration Services for the WWTP Secondary Treatment Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Amendment No. 2 to PSA - Arcadis US, Inc. - Construction Administration Services for the WWTP Secondary Treatment Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 4:11:38 PM
Creation date
8/9/2017 2:17:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 2 of 3 <br />Between City of South Bend and ARCADIS U.S., Inc. Project Number: 03029034.0000 <br />AMENDMENT No. 2 <br />Schedule A-1 <br />Scope of Amended Services and Related Matters <br />ENGINEERING SERVICES BY ARCADIS <br />General Administration: Arcadis provided additional general administration services primarily related to clarifications <br />and interpretations (139 RFIs to -date), change orders (79 change requests resulting in 13 approved change orders to -date <br />and an additional change orders that is pending), and as -needed construction inspection support. Note that the change <br />orders included new construction scope of work (e.g. aeration effluent valve replacement, exposed process air piping <br />replacement, aeration gallery top slab). Arcadis will continue to provide these services through the Contractor's proposed <br />schedule as further described in the Meetings and Site Visits task below. Should the Contractor's schedule extend beyond <br />their proposed date, additional general administration may be necessary through a future amendment. In addition, Arcadis <br />provided services related to the dewatering system claim including providing the Engineer's Determination of Entitlement <br />as the written decision on the dewatering system claim submitted by the Contractor on December 12, 2017. <br />Meetings and Site Visits: Arcadis will attend three additional progress meetings and observe the progress of Contractor's <br />executed work during the same visits. The Contractor's progress schedule submitted on July 11, 2017 indicated completion <br />of the "east side" work on October 5, 2017. This does not include the RAS chlorination work to be added and it is assumed <br />that the Contractor will be able to complete all the work no later than October 31, 2017. The anticipated completion is three <br />months later than the original Substantial Completion date of July 26, 2017. Based on the pending Change Order No. 13, <br />the revised contract Substantial Completion date is March 8, 2018. Should the Contractor's schedule extend beyond the <br />anticipated date, additional visits may be necessary through a future amendment. <br />South Bend Secondary Improvements CA_Amendment No. 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.