My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Lawson Fisher Associates - West Race Bank Trail Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Lawson Fisher Associates - West Race Bank Trail Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:43:49 AM
Creation date
7/27/2017 8:54:00 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX 2 <br />SCOPE OF WORK <br />Scope of Work: <br />TOPOGRAPHIC SURVEY <br />LFA will conduct the survey and will acquire topographic information in the <br />following areas: <br />Immediately South of the Jefferson Street Bridge north to the pedestrian <br />bridge from the Century Center to Island Park. The survey will extend from <br />the east at the River's edge to the western side of the maintenance road <br />running alongside the Century Center. <br />Along the West bank from the North end of Island Park to Lasalle Avenue. <br />The survey will include the topographical features of both Pier Park and <br />Gwen Stiver Park. <br />The topographic survey will be such to provide a complete surface model, <br />complete linework, utility linework (from various sources), surface types labeled, <br />horizontal and vertical control (monumented and referenced), and survey notes <br />and reporting. This proposal does not include topography within the West Race, <br />beyond the limits of the retaining walls along St. Joseph Street or the east face <br />of the Century Center, and river topography beyond the immediate slope <br />representation below the water line. <br />The proposed survey will be capable of supporting the project through to <br />complete construction documents. <br />2. PROGRAM VALIDATION <br />A. LFA will gather and review existing information regarding the project and <br />project area. <br />B. LFA will conduct two (2) workshops with the appropriate City staff to <br />review the project areas which will be defined as follows: <br />Jefferson Blvd. to the Pedestrian Bridge at Island Park <br />The North end of Island Park to Colfax Avenue including Pier Park <br />Colfax Avenue to Lasalle Avenue including Gwen Stiver Park <br />These workshops will be used to discuss the possible alternatives for each <br />area including: <br />• Potential layouts and alignments <br />• Park and trail lighting <br />• Fishing piers <br />• Sculpture and public art elements <br />• Landscape and plaza enhancements, site furnishings (e.g. <br />benches, bicycle parking, fencing and railings, etc.) <br />Appendix 2, Scope of Work <br />EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. <br />Copyright ©2009 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.