My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Lawson Fisher Associates - Raised Crosswalk on Fellows St. at Riley High School
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Lawson Fisher Associates - Raised Crosswalk on Fellows St. at Riley High School
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:43:39 AM
Creation date
7/27/2017 8:36:19 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. If during the construction phase it is determined that unforeseen or unusual <br />conditions arise, revise the plans as may be necessary. <br />PART II. SCHEDULE, FEE AND CONDITIONS <br />A. <br />B. <br />C. <br />Q. h.A.A. <br />Time is of the essence due city desire to complete within this construction season and <br />shall be completed measured in calendar days as described below: <br />1. Topographic Survey shall be completed within 15 days as described in Part LA from <br />the Notice to Proceed or sooner. <br />2. Preliminary Plans shall be completed within 30 days as described in Part LB items 1 <br />through 5 <br />3. Finalized plans shall be completed within 15 days from reviews described in Part 1.B <br />items 6 and 7. <br />4. Quotes will be solicited by the Owner once construction documents are complete. <br />Construction is anticipated to begin directly with an expected construction duration <br />not to exceed 30 days. <br />Fee <br />1. LFA proposes to provide the described Scope of Services on an hourly basis with an <br />estimated budget of $8,750. A man-hour justification has been prepared for review <br />of anticipated effort supporting this estimate. Allocated hours are not tied to specific <br />tasks for fees. <br />A. <br />Topographic Survey <br />$2,150.00 <br />B. <br />Contract Documents <br />4,950.00 <br />C. <br />Bid Period Services <br />850.00 <br />D. <br />Construction Phase Services <br />800.00 <br />Total $8,750.00 <br />3. If prior to the satisfactory completion of the professional services described, the total <br />costs incurred is within 20% of estimated budget, LFA will notify the City and <br />development status will be evaluated. <br />Conditions <br />The following items will be provided by the City or are otherwise considered an <br />additional service not included with the described professional services. <br />1. It is understood that LFA shall have access to all City files and documents in its <br />possession and at its disposal pertaining to this work. <br />Appendix 2, Scope of Work <br />EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. <br />Copyright ©2009 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.