Laserfiche WebLink
C. All dates shown are based on a Notice to Proceed received not later than July 25, 2017. Design <br />Development dates are based on an anticipated grant award that will be announced on August 31, <br />2017. <br />A3.02 Construction <br />A. Questions, clarifications or corrections requested by the Owner's construction personnel regarding <br />the interpretation of the Engineer's plans shall be addressed within a reasonable period of time <br />from the Engineer's receipt of the Owner request. <br />B. Modification to the plans during the construction phase due to unforeseen or unusual conditions <br />shall be made within a reasonable period of time following receipt by the Engineer of the Owner's <br />request and notice to proceed. <br />Page 12 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />