My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Epoch Architecture + Planning - Fire Station No. 9 Design
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Epoch Architecture + Planning - Fire Station No. 9 Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:38:07 AM
Creation date
7/27/2017 8:27:05 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARCHITECTURE + PLANNING <br />PROPOSAL <br />July 10, 2017 <br />City of South Bend <br />Dept. of Public Works, Division of Engineering <br />Attn: Mr. Kevin Fink, Project Manager <br />227 W. Jefferson Blvd. <br />South Bend, IN 46601 <br />Re: New Fire Station #9 <br />Dear Kevin, <br />On behalf of EPOCH, I would like to thank you for giving us the opportunity to present to you our <br />proposal for professional services regarding the new Fire Station #9 along Mishawaka Avenue between <br />Ironwood Drive and 21" Street. <br />Proiect Scope <br />Based on our conversations with you we understand the development of the new Fire Station #9 will be <br />approx. 8,000 sf and most likely a combination of single story apparatus bay and two-story construction. <br />The project is expected to be LEED Silver Certified. We understand the project will be bid in later winter, <br />early spring for a spring 2018 construction start. We will work with you to define an adequate design <br />phase schedule that works with both of our schedules while providing adequate time for submittal to <br />the Board of Public Works. <br />We will work within traditional design phases: <br />• Programming <br />• Schematic Design <br />• Design Development <br />• Construction Documents <br />• Bidding <br />• Construction Administration <br />We will establish goals for each of the phases and receive sign offs at each milestone. This will ensure <br />everyone is on the same page and that the progress being made matches the established schedule. <br />In addition to Design Services directly provided by Epoch Architecture + Planning we will also enter into <br />contract with the following consultants: <br />300 W Jefferson Blvd., Suite 200, South Send, IN 46601, P: 574-307-9990 <br />
The URL can be used to link to this page
Your browser does not support the video tag.