My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Epoch Architecture + Planning - Fire Station No. 9 Design
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Epoch Architecture + Planning - Fire Station No. 9 Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:38:07 AM
Creation date
7/27/2017 8:27:05 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Factors: The external Reimbursable Expenses and Engineer's Consultant's Factors include <br />Engineer's overhead and profit associated with Engineer's responsibility for the <br />administration of such set -vices and costs. <br />3. To the extent necessary to verify Engineer's charges and upon Owner's timely request, <br />Engineer shall make copies of such records available to Owner at cost. <br />Page 2 <br />Exhibit C —Compensation Packet AS-9: Additional Services — <br />Standard Hourly Rates Method of Payment <br />EJCDC E-SW Agreement Between Owner and Engineer for Professional Servioes. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.