My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Epoch Architecture + Planning - Fire Station No. 9 Design
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Epoch Architecture + Planning - Fire Station No. 9 Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:38:07 AM
Creation date
7/27/2017 8:27:05 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br />This is EXHIBIT C, consisting of 2 pages, referred to in <br />and pant of the Agreement between Owner and Engineer for <br />Professional Set -vices dated July 25, 2017. <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services — Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties. - <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) —Lump Sum Method <br />of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer's Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $285,570 based on the following estimated distribution of <br />compensation: <br />a. Pre -Design Phase $38,120 <br />b. Schametic Design Phase $49,600 <br />c. Design Development Phase $24,800 <br />d. Construction Document Phase $86,800 <br />e. Bidding and Negotiation Phase $12 500 <br />f. Construction Administration Phase $49 300 <br />g. LEED Silver Commissioning $15,000 <br />h. LEED Silver Documentation $9 450 <br />1) Includes USGBC application fees <br />2. Engineer may alter the distribution of compensation between individual phases noted herein <br />to be consistent with services actually rendered, but shall not exceed the total Lump Sum <br />amount unless approved in writing by the Owner. <br />Page I <br />Exhibit C —Compensation Packet BC-1: Bad Servioes(other than RPR)—Lump Sum Method of Payment <br />EJCCC E-6WAgremml Between Owner and Engineer for Professional Services, <br />Copyright cC 2008 National Society of Professional Engineers for EJCUC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.