My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Memorandum of Understanding - St Joseph County Public Works - Mayflower Road Paving
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Memorandum of Understanding - St Joseph County Public Works - Mayflower Road Paving
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 8:26:36 AM
Creation date
7/26/2017 2:19:48 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEMORANDUM OF UNDERSTANDING <br />FOR THE MAYFLOWER ROAD REPAVEMENT PROJECT <br />This Memorandum of Understanding, is made and entered into this day of <br />ljt 2017, by and between the BOARD OF PUBLIC WORKS OF THE CITY OF <br />SO H BEND, INDIANA (hereinafter referred to as "South Bend"), acting by and through its <br />Department of Engineering, and the BOARD OF COMMISSIONERS OF THE COUNTY <br />OF ST. JOSEPH, INDIANA (hereinafter referred to as "County"), acting by and through its <br />Department of Public Works. <br />RECITALS <br />WHEREAS, South Bend and County mutually agree to accommodate the Mayflower <br />Road Repavement Project to repave Mayflower Road from Western Avenue to Lincoln Way <br />West (the "Project"), and <br />WHEREAS, South Bend and County mutually agree that the existing road is severely <br />deteriorated and requires pavement, and <br />WHEREAS, South Bend and County have individually identified local funding sources <br />for the infrastructure replacement and other requested specific improvements on Mayflower <br />Road, and <br />WHEREAS, South Bend and County acknowledge such an improvement is mutually <br />beneficial to each parties' transportation needs, and <br />NOW, THEREFORE, in consideration of the foregoing and of the promises and <br />commitments, herein contained, the parties hereby agree as follovvs: <br />1. Contract Administration: County shall bid and administer the Project and shall coordinate <br />as necessary with South Bend. South Bend reserves the right to inspect the work performed by <br />the County's contractor to ensure that such work has been completed in a workmanlike standard <br />acceptable to South Bend. <br />2. Consideration: South Bend shall pay the County for the items outlined in Exhibit A, <br />attached and incorporated herein. The cost to South Bend is not to exceed $172,631,88 without <br />the express written approval from South Bend. South Bend may, at its sole discretion, provide <br />additional funding for grass blanket stabilization. <br />3. Additional Project Responsibilities: The County understands and agrees that it shall have <br />the sole responsibility to berm the edge of the pavement, rework the shoulder area, and trim trees <br />as necessary for areas throughout the Project. <br />4. Swale/drainage improvements to be performed by the Coon : The County shall remove <br />the built up area on the east side of the road from Washington to Linden, which is approximately <br />
The URL can be used to link to this page
Your browser does not support the video tag.