My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec T Eighteen (18) More or Less New Heavy Duty Mobile Lifting Systems - Interstate Lift & Equipment Company, Inc. (bid security chk submitted)
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Spec T Eighteen (18) More or Less New Heavy Duty Mobile Lifting Systems - Interstate Lift & Equipment Company, Inc. (bid security chk submitted)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 12:01:27 PM
Creation date
7/11/2017 2:51:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.2.1.Each Primary panel shall Include: <br />• A NEMA 4 rated control enclosure. <br />• A disconnect switch to control source power, Switch shall be capable of being locked in the <br />off position for operator safely. <br />• A pilot light to indicate that the power is turned on. <br />• A phase relay to assure proper phasing of the supply power <br />• A transformer to convert incoming supply voltage to 110V which is supplied to the PC. The <br />PC then supplies 24V to the control circuit. Transformers shall have fuse protection <br />• A spring loaded three position selector switch for selecting ALL, PAIR or SINGLE operation. <br />• An ADDRESS switch to designate column number. <br />• Two dead -man type push buttons for UP and DOWN operation. <br />• A PARK button to engage the mechanical lock. <br />• A red FAULT light to indicate a fault in the lift operating system. <br />• A PO to monitor the proper operation of the lift and provide motion control. <br />• Red LED lights to with diagnostic chart to aid in fault trouble shooting. <br />• Thermal relay to protect the motor in the event of an overload. <br />• Fuse protection to protect the cables in the event of a short circuit. <br />• A red mushroom palm type emergency stop button to allow immediate manual shut down of <br />the entire lifting system. <br />A power cable with a minimum length of 50 feet. <br />7.3. The primary column control panel shall have the capacity to be used as a primary panel or a <br />secondary panel without electrical modification. An ADDRESS switch on each primary column <br />shall allow the column to be designated any column number 1 through 10 (a maximum of 10 <br />columns per set may be used). A primary column may be designated as a primary by selecting <br />number 1 or as a secondary by selecting numbers 2 through 10. The secondary columns may <br />be designated as any column number 2 through 10 using the ADDRESS switch. The control <br />system shall allow the flexibility of breaking up sets to be used as sets of two in geographically <br />separate areas or combining sets to create a set of up to ten without modifying the electrical <br />system. <br />7.4. Individual operation of each column shall be achieved by simultaneously turning and holding the <br />spring loaded operation mode selector switch to the SINGLE position and pressing the UP or <br />DOWN button on that column. Lifts that use operation mode selector switches that are not <br />spring loaded shall not be accepted due to the possibility of Inadvertent switching by other <br />operators in the shop. <br />7.5. Paired or axle operation shall be achieved by simultaneously turning and holding the spring <br />loaded operation mode selector switch on either of the two columns on the axle to the PAIR <br />position and pressing the UP or DOWN button on that column. Lifts that require a complicated <br />sequence of pressing reference buttons on multiple columns shall not be accepted. <br />7.6. Paired or Individual operation shall be permitted at any time during the lifting cycle. It shall be <br />possible to switch from SINGLE, PAIR, or ALL operation in any order regardless of the height <br />position of the columns. <br />7.7. The control system shall utilize a printed circuit board and micro -processor to ensure proper <br />operation of the lift. The printed circuit board shall have LED lights with a diagnostic chart to <br />facilitate trouble shooting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.