My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 13 - WWTP Secondary Improvements Proj No 114-053 - Thieneman Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 13 - WWTP Secondary Improvements Proj No 114-053 - Thieneman Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:54:59 PM
Creation date
7/11/2017 2:45:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />WWTP SECONDARY TREATMENT IMPROVEMENTS <br />CITY PROJECT NO. 114-053 <br />CHANGE ORDER PROPOSAL <br />Change Order Proposal No.: 114-053-077 Date: 5/4/17 <br />Submitted in Response to Proposal Request No.: <br />Contract Name and No.: 114-053 South Bend WWTP Secondary Treatment Improvements <br />Contractor: Thicneman Construction, Inc. <br />Subject: Rc-Install existing sump pump in the NB corner of Gallery 4 basement as requested. <br />Contract documents did not show that a sump pump even existed. Existing sump pump was <br />connected to piping that was required removal. <br />The following changes to the Contract are proposed: <br />SCOPE OF WORK: (attach and list supporting information as required) <br />1. Item: TCI — See attached cost breakdown - $1,007.00 <br />JUSTIFICATION: <br />1. .Item: Owner Request <br />CHANGES IN CONTRACT PRICE AND CONTRACT TIMES: <br />We propose that the Contract Price and Contract Times be changed as follows: <br />For Contract Price, when requested by Engineer, attach detailed cost hreakdowns for Contractor and <br />Subcontractors, Supplier quotalions, and other it joruration required, <br />For the Contract Tines, slate increase, decrease, or no change to Contract Times for Substanlial Completion, <br />readiness for• frrrctl pay=uteri!, and Milestones, ifagi,. If increase or decrease, state specific number ofdays for changes <br />to the Contract Trines, <br />Description <br />Amount <br />Contract Times (days) <br />Substantial <br />I Final <br />1. Item — TCI <br />$1,007.00 <br />0 <br />0 <br />2. Item — TO — Markup: 5% Subs 1 15% TC1 <br />$151,00 <br />0 <br />0 <br />Total This Change Order Proposal <br />$1,158.00 <br />0 <br />0 <br />Changes to Milestones if any: NIA <br />The adjustment proposed is the entire adjustment to the Contract to which the proposer believes it <br />is entitled as a result of the proposed change. <br />Change Order Proposal By: CraigSteele <br />teele <br />Signature of Proposer: <br />
The URL can be used to link to this page
Your browser does not support the video tag.