My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - HWC Engineering, Inc. - Water Main Extension for Prairie Avenue Water Main Loop
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - HWC Engineering, Inc. - Water Main Extension for Prairie Avenue Water Main Loop
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:40:39 AM
Creation date
6/28/2017 2:35:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/27/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F. All policies of insurance shall contain a provision or endorsement that the coverage afforded will <br />not be canceled or reduced in limits by endorsement, and thatrenewal will not be refused, until at <br />least 30 days prior written notice has been given to Owner and Engineer and to each other <br />additional insured (if any) to which a certificate of insurance has been issued. <br />G. At any time, Owner may request that Engineer or its Consultants, at Owner's sole expense, <br />provide additional insurance coverage, increased limits, or revised deductibles that are more <br />protective than those specified in Exhibit G. if so requested by Owner, and if commercially <br />available, Engineer shall obtain and shall require its Consultants to obtain such additional <br />insurance coverage, different limits, or revised deductibles for such periods of time as requested by <br />Owner, and Exhibit G will be supplemented to incorporate these requirements. <br />6.05 Suspension and Termination <br />A. Suspension: <br />By Owner: Owner may suspend the Project for up to 90 days upon seven days written <br />notice to Engineer. <br />2. By Engineer: Engineer may, after giving seven days written notice to Owner, suspend <br />services under this Agreement if Engineer's performance has been substantially delayed <br />through no fault of Engineer. <br />B. Termination: The obligation to provide further services under this Agreement may be terminated: <br />1. For cause, <br />a. By either party upon 30 days written notice in the event of substantial failure <br />by the other party to perform in accordance with the terms hereof through no <br />fault of the terminating party. <br />b. By Engineer: <br />1) upon seven days written notice if Owner demands that Engineer <br />furnish or perform services contrary to Engineer's responsibilities as <br />a licensed professional; or <br />2) upon seven days written notice if the Engineer's services for the <br />Project are delayed or suspended for more than 90 days for reasons <br />beyond Engineer's control. <br />3) Engineer shall have no liability to Owner on account of such <br />termination. <br />C. Notwithstanding the foregoing, this Agreement will not terminate under <br />Paragraph 6.05.B.l.a if the party receiving such notice begins, within seven <br />days of receipt of such notice, to correct its substantial failure to perform and <br />proceeds diligently to cure such failure within no more than 30 days of <br />receipt thereof; provided, however, that if and to the extent such substantial <br />Page 8 <br />EJCDC E-500 Agreentent Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.