Laserfiche WebLink
ALTERNATE 93 <br />i <br />Stem <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />In lieu of the base specification tower, <br />provide a Marley AV Series, 3-cell <br />Tower as described as an Alternate in <br />the specifications. This Alternate should <br />not only include the alternate tower, but <br />1 <br />LS <br />---- <br />i <br />should also include design and <br />associated installation work necessary <br />for structural, electrical and mechanical <br />modifications to accommodate the <br />—$20 000 00 <br />alternate bid tower. <br />ALTERNATE f#3 TOTAL <br />• 1 <br />$20,000.00 (DEDUCT) <br />/-►L 1 Gf�iY <br />Item <br />No. <br />/Y 1 L. tt'T <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />In lieu of the galvanized materials <br />covered in the Alternate #3 above, the <br />drain trays and cold water basin shall be <br />1 <br />LS <br />---- <br />1 <br />fabricated of 316 stainless steel with <br />$5,000.00 <br />stainless steel fasteners. <br />ALTERNATE ##4 TOTAL $5,000.00 (ADD) <br />Bidder (Firm): Herrman & Goetz, Inc. <br />Address:. Lafa efts Blvd. <br />GitylState/Zip: So Bend, IN 66 iephone Number: 574 282-2596 <br />(Signature) <br />Larry Crij2e, Power —of --Attorney <br />(Printed Name of Person Signing) <br />Project No. 117-035 Contractor's Bid for Public Works - 8 <br />