My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to PSA - Lawson Fisher Assoc. - South Bend Dam
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Amendment to PSA - Lawson Fisher Assoc. - South Bend Dam
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 4:14:52 PM
Creation date
6/28/2017 1:55:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/27/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LFA Project File 9030.04 <br />This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated July 12, 2016. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 1 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: July 12, 2016 <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />c. Engineer: <br />Lawson -Fisher Associates P.C. <br />d. Project: South Bend Darn Underwater Inspection and Bathymetric Survey <br />City Project No. 116-071 <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />In addition to the contracted Scope of Work for the South Bend Dam Underwater <br />Inspection and Bathymetrie Survey, LFA will prepare the Dam Safety Surveillance <br />and Monitoring Report (DSSMR) to be submitted to the FERC. The City will <br />provide LFA with all necessary completed tables that have been developed since the <br />last submitted DSSMR (April 1, 2011), This DSSMR will not include the <br />underwater inspection which will be performed once flows permit and will be <br />submitted separately. <br />b. For the Additional Services or the modifications to services set forth above, Owner <br />shall pay Engineer the following additional or modified compensation: <br />$3,000.00 <br />C. The schedule for rendering services is modified as follows: <br />• Completion of DSSMR by July 10, 2017. <br />• Completion of undewater inspection (River Flow Permitting): September 22, <br />2017. <br />3. Agreement Summary (Reference only) <br />a. Original Agreement amount: $16,600.00 <br />b. Net change for prior amendments: $ 0.00 <br />c. This amendment amount: $ 3,000.00 <br />d. Adjusted Agreement amount: $19,600.00 <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved, <br />
The URL can be used to link to this page
Your browser does not support the video tag.