My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Memorandum of Understanding - Great Lakes Capital - Building Permit 5550 Dylan Drive
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Memorandum of Understanding - Great Lakes Capital - Building Permit 5550 Dylan Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 4:37:40 PM
Creation date
6/15/2017 9:20:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/13/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. Sewer Master Planning Study <br />In consideration of the City issuing a full site plan permit from the City's Building <br />Department prior to the completion of the Study, Owner agrees that if the Study, as interpreted by <br />the City and Abonmarche Consultants only, determines that the Owner's proposed location of the <br />sewer line and connection pursuant to its development, as set forth in Exhibit A, needs to be moved, <br />resized, rerouted, or otherwise relocated for any reason, Owner shall, at its sole expense, promptly <br />relocate said sewer line in order to comply with the recommendations of the Study. The City <br />agrees to use good faith efforts to facilitate the completion and review of the Study within 75 days. <br />If no determination regarding changes to the proposed location of the sewer line is made within 75 <br />days, Owner may proceed with its plans and following installation not have obligations under this <br />section. <br />2. Construction Representations <br />The City shall review and approve the engineering design/drawings and inspection in <br />connection with the installation of the said sanitary sewer line which shall be prepared according <br />to City standards and specifications (the "Plans"). The Owner shall provide the City with drawings <br />of record which shall confoz1n to City standards. The Owner shall be responsible to provide <br />inspection during construction and to ensure the engineer's conformance to area planning, <br />adequacy of design, and conformance to the Plans prepared to City requirements regarding <br />location, size and depth of line, capacity and arrangement of lift stations, and quality of <br />construction. The Owner shall provide to the City a statement from the proj ect engineer certifying <br />that the materials and workmanship including pipes, bedding, thrust blocks, valves, fire hydrants, <br />manholes, lift station equipment and other related materials and work, meet the Plans. Upon <br />request of the City, the certification shall be substantiated by material affidavits from suppliers and <br />
The URL can be used to link to this page
Your browser does not support the video tag.