My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Nos. 10, 11, 12 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order Nos. 10, 11, 12 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:59:12 PM
Creation date
6/15/2017 9:15:51 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/13/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF UTILITIES <br />TO: Members of the Board of Public Works <br />Eric Horvath, Director of Public Works <br />Michael Schmidt, Board of Public Works Attorney <br />FROM. Al Greek, Director of Utilities <br />Jacob M. Klosinski, Assistant City Engineer <br />SUBJECT: Agenda Request Form — Change Order No. 11 <br />Project No. 114-053: Wastewater Treatment Plant Secondary Treatment <br />Improvements <br />DATE: June 6, 2017 <br />The Division of Utilities is requesting the Board of Public Works approval of Change Order No. <br />11 for Project No, 114-053 Wastewater Treatment Plant Secondary Treatment Improvements. <br />Refer to attached documents for supporting details for work. <br />Change Order No. 11 addresses the following changes: <br />Wall Opening (sawcutting, drilling and demolition) <br />Concrete Gate Pockets and Masonry Patching at Gallery #3 for Final Clarifier 4 & 5 Gates <br />New Aluminum Walkways for Access to Gate Actuators <br />Electrical Relocations <br />Refer to Cost Breakdown Sheet for Line Item Cost Details. <br />Notes: <br />Cost breakdown for "Request for Proposal No. 2" herein described as Change Order No. 11. <br />Approval of Change Order No. 11 with Change Order No. 12 provides cost savings. <br />Original Cost Estimate $41,892.55 - $10,343.00 (reduction) = $31,549.55 <br />Final Cost for Change Order No. 11 = $31,550.00 <br />NET INCREASE FOR CHANGE ORDER NO. 11 ITEMS <br />Original Contract Sum <br />Net change by previously authorized change orders <br />The contract sum prior to this change order <br />By this change order, the project amount increases by <br />The new contract sum including this change order is <br />This Change Order represents a total change of <br />Total change for the entire project <br />Time Extensions resulting from Change Order No. 11. <br />Substantial Completion: <br />Final Completion: <br />$ 31,550.00 <br />$11, 885, 000.00 <br />$ 1,583,684.87 <br />$13,468, 684.87 <br />$ 31,550.00 <br />$13,500,234.87 <br />+0.26% <br />+13.59% <br />+0 days <br />+0 days <br />
The URL can be used to link to this page
Your browser does not support the video tag.