My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 14 - SB One Way to Two Way Conversion Division B Proj No 116-001 - Rieth Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No 14 - SB One Way to Two Way Conversion Division B Proj No 116-001 - Rieth Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:33:02 PM
Creation date
6/15/2017 9:15:13 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/13/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project No, 116-001 <br />OWNER: <br />ENGINEER: <br />CONTRACTOR: <br />PROJECT: <br />SUBJECT: <br />ISSUE DATE: <br />City of South Bend <br />Lochmueller Group <br />Myron Cohagan <br />Rieth-Riley Construction <br />South Bend One -Way to Two -Way Street Conversion <br />Project No. 116-001 <br />Thermal Detection Systems <br />May 19, 2017 <br />Change Order No. 44- <br />5119117 <br />This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be <br />incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change Order: <br />1. Add thermal imaging detection equipment at the following intersections: <br />Intersection <br />Division <br />Saint Joseph Street & Colfax Street <br />B <br />Saint Joseph Street & Wayne Street <br />B <br />Michigan Street & South Street <br />B <br />Note: This work is not detailed in the plans. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS-. <br />Division B: <br />Revise line Item No. 276: "THERMAL DETECTION CAMERA", from 26 EACH @ <br />$4,680.00/EACH to 34 EACH @ $4,680.00/EACH for a Total Increase of $37,440.00. <br />Revise Line Item No. 277: "THERMAL DETECTION SYSTEM", from 8 EACH @ $11,800.00/EACH <br />to 11 EACH @ $11,800,00/EACH for a Total Increase of $35,400.00. <br />Total Increase for Division B of $72,840.00 <br />The following special provisions have been amended or added to the Contract Documents and are issued as <br />a part of this Change Order: <br />
The URL can be used to link to this page
Your browser does not support the video tag.