Laserfiche WebLink
€Zl:VlSl0\1 i I <br />HRP CONSTRUCTION INC. <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name Newman Center Site Development <br />Project No. 117-060 <br />For Bids Due June 13, 2017 <br />��,: pit• I9:nc;�-Jr:_f <br />0mor- <br />Item <br />No.Description <br />Diu <br />Quantit Y <br />Unit <br />Unit <br />Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS•tr� <br />2" <br />Mobilization and Demobilization <br />1 <br />L5 <br />3. <br />Video Record <br />1 <br />LS <br />j,00 <br />. pp <br />4• <br />Maintaining Traffic <br />1 <br />LS <br />5 t .o <br />S °on. oo <br />5. <br />Inspection Hole <br />4 <br />EA <br />500,co <br />09O0.019 <br />6. <br />Clearing Right of Way <br />1 <br />L5 <br />�,oO <br />gyp. era <br />7. <br />Pavement Removal <br />491 <br />SYS <br />�, zapaqAso <br />C)p <br />$ <br />Common Excavation <br />1 <br />LS <br />Sax to <br />�q 900- 4)p <br />9. <br />Temporary Erosion Control <br />1 <br />LS <br />A45j6. I'D <br />o•,00 <br />Temporary Silt Fence <br />565 <br />LF <br />ff12 <br />Temporary Inlet/Outlet Protection <br />4 <br />EA <br />"7,5,r)� <br />;pV'Op <br />Compacted Aggregate, No. 53, Base <br />39 <br />TON <br />--SS ap <br />A-5 pp <br />13• <br />HMA for Patching, Type A <br />5 <br />TON <br />&56, op. <br />750, ao <br />14. <br />HMA for Parking Lot <br />115 <br />SYS <br />15. <br />PCC P For Approaches, 8 IN <br />46 <br />SYS <br />1 p , Oa <br />16. <br />Seeding and Sodding <br />1148 <br />SYS <br />4 �i. <br />17 <br />Sanitary Sewer Service, including <br />cleanouts <br />130 <br />LF <br />18. <br />Existing Sanitary Sewer Service, Removal <br />1 <br />LS <br />6p, pp <br />Spp ,Cx, <br />19. <br />Water service (fire) <br />52 <br />LF <br />36Aco <br />20. <br />Water service (domestic) <br />52 <br />LF <br />/cv. , Dn <br />co. OcD <br />21. <br />Overhead Utility, Removal <br />1 <br />LS <br />�`�?, to <br />3, 00 <br />22. <br />Light Pole, Removal <br />2 <br />EA <br />70,1)0 <br />940,00 <br />23, <br />Tree, Remove <br />2 <br />EA <br />.t-10 <br />24. <br />Concrete Sidewalk <br />252 <br />SYS <br />p 6)D <br />25. <br />Concrete Stairs <br />17 <br />SYS <br />ev 61 7(0 <br />26, <br />Concrete Patio <br />145 <br />SYS <br />f(p �( <br />27. <br />Handralls for Stairs <br />76 <br />LF <br />t 7RU <br />J,3 • 7 <br />Version 10/17/2016 Contractor's Bid for Public Works - 7 <br />