Laserfiche WebLink
Exhibit C <br />St. Joseph County Economic Development District No. 2 <br />Costs Associated with the Proposed St. Joseph Energy Center <br />(Note: Items 1,2,4 & 5 under each major category is to be paid by the St. Joseph Energy Center)` <br />Sept. 21, 2015 <br />Opinion of Cost Estimate Summa - 2016 <br />Dollars <br />No]l <br />Project Description <br />Est. Cost <br />Comments <br />Design Engineering Cost <br />1 <br />Well Fields Development, Aquifer Analysis & Design <br />$290,000 <br />Some In Progress <br />2 <br />Walnut Road Sanitary Sewer Extension (North to US 20) <br />$95,000 <br />3 <br />Walnut Road & US 20 Water Main connection (West) <br />$131,000 <br />4 <br />US 20 Sanitary Sewer Extension (East) <br />$150,000 <br />4a <br />US 20 Water Main Extension (East) <br />$154,000 <br />5 <br />New GS Water Treat. Plant on St. Joseph Energy Center Site <br />$611,000 <br />Total Cost = <br />$1,431,000 <br />Bidding Services <br />1 <br />Well Fields, Pumps Piping & Enclosures <br />$3,000 <br />2 <br />Walnut Road Sanitary Sewer Extension (North to US 20) <br />$3,000 <br />3 <br />Walnut Road & US 20 Water Main connection (West) <br />$3,000 <br />4 <br />US 20 Sanitary Sewer Extension (East) <br />$3,000 <br />4a <br />US 20 Water Main Extension (East) <br />$3,000 <br />5 <br />New GS Water Treat. Plant on St, Joseph Energy Center Site <br />$8,000 <br />Total Cost = <br />$23,000 <br />Construction Cost <br />1 <br />Well Fields, Pumps Piping & Enclosures <br />$2,205,000 <br />12 MGD <br />2 <br />Walnut Road Sanitary Sewer Extension (North to US 20) <br />$1,346,000 <br />3 <br />Walnut Road & US 20 Water Main connection (West) <br />$1,859,000 <br />4 <br />US 20 Sanitary Sewer Extension (East) <br />$2,132,000 <br />4a <br />US 20 Water Main Extension (East) <br />$2,192,000 <br />5 <br />New GS Water Treat, Plant on St. Joseph Energy Center Site <br />$10,183,000 <br />12 MGD <br />Total Cost = <br />$19,917,000 <br />Construction Administration and Observation Cost <br />1 <br />Well Fields, Pumps Piping & Enclosures <br />$177,000 <br />2 <br />Walnut Road Sanitary Sewer Extension (North to US 20) <br />$108,000 <br />3 <br />Walnut Road & US 20 Water Main connection (West) <br />$149,000 <br />4 <br />US 20 Sanitary Sewer Extension (East) <br />$171,000 <br />4a <br />US 20 Water Main Extension (East) <br />$176 000 <br />5 <br />New GS Water Treat. Plant on St. Joseph Energy Center Site <br />$815,000 <br />Total Cost = <br />$1,596,000 <br />Other Project Costs <br />6 <br />Permits - Sanitary <br />$27,000 <br />7 <br />Permits - Water <br />$27,000 <br />8 <br />ROW & Litigation (Lake Property & Walnut @ US 20) <br />$21,000 <br />33% San Sewer <br />9 <br />ROW & Litigation (Lake Property & Walnut @ US 20) <br />$43,000 <br />67% Water <br />10 <br />Existing (I/N Tek) Water Treatment Plant Upgrade <br />$2,919,000 <br />Total Cost - <br />$3,037,000 <br />Estimated Total Cost = $26,004,000 <br />*Portion of Above Costs Anticipated to be Paid by the St. Joseph Energy Center = <br />$18,321,000 <br />Total Cost of Construction (Rounded to the nearest $1,000) <br />