My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec O - One (1) or More, 2017 or Newer 70' Aerial Four WHeel Drive Tower Truck Complete - Altec Industries, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Spec O - One (1) or More, 2017 or Newer 70' Aerial Four WHeel Drive Tower Truck Complete - Altec Industries, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 11:59:13 AM
Creation date
5/24/2017 2:07:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Apply Non -Skid Coating to all walking surfaces. <br />S <br />O <br />Decals installed: <br />O <br />2 EACH KEYCHAINS <br />3 EACH CITY LOGO DECALS <br />I EACH FUEL DECAL (DIESEL) <br />I EACH PM SERVICE NOTICE DECAL <br />I EACH FEDERAL INSPECTION FORM <br />1 EACH FEDERAL INSPECTION STICKER <br />1 EACH DIELECTRIC INSPECTION DECAL <br />1 EACH FALL PROTECTION DECAL <br />2 EACH D.O.T. DECALS <br />1 EACH WEIGHT DECAL <br />2 EACH AMERICAN FLAG <br />2 EACH AC / LIVE LINE DECALS <br />I EACH ULTRA LOW SULFUR DECAL <br />I EACH NINE TO KNOW, ENGLISH <br />1 EACH PARKING BRAKE DECAL <br />1 EACH TRAILER BRAKE DECAL <br />1 EACH TRIP LOG BOOK <br />I EACH SAFETY FIRST DECAL <br />I EACH AERIAL FACTORY SAFETY KIT DECAL SET <br />3 SETS RED UNIT NUMBERS SEQUENCE <br />English Safety And Instructional Decals. <br />/NO <br />Vehicle Height Placard --- Installed In Cab. <br />O <br />Placard, HVI-22 Hydraulic Oil. <br />ES <br />O <br />Dielectric test unit according to ANSI requirements. <br />YE <br />NO <br />Stability test unit according to ANSI requirements. <br />O <br />DOT Certification Required. <br />YE <br />O <br />31 Day Temporary tag. <br />_ YES <br />O <br />Delivery Of Completed Unit. <br />YE <br />O <br />Onsite customer training of safe a eration of unit upon delivery. <br />YE <br />NO <br />Installation - LR7-60E70 Aerial Device. <br />O <br />Factory and Service Center located in Indiana. <br />Y E-S)N <br />O <br />Chassis: <br />CHASSIS MODEL Q <br />YES <br />O <br />Chassis <br />YE <br />O <br />2018 Model Year <br />YE <br />O <br />Freightliner M2-106 <br />YE <br />NO <br />4x4 ( <br />YES <br />O <br />144 Clear CA Round To Next Whole Number f <br />YE <br />O <br />Regular Cab <br />YE <br />O <br />Chassis Color - White <br />YE <br />O <br />Cummins ISB <br />--Y-MNO <br />280 HP Engine Rating <br />Y <br />INO <br />Allison Automatic Transmission <br />YES <br />O <br />GVWR 33,000 LBS <br />YE <br />O <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.