Laserfiche WebLink
Center of roof 16" back from windshield. Run wires to center <br />console. <br />13.) Install customer supplied siren speaker and connect to light/siren <br />control. <br />All installation and mounting locations to be approved by a representative <br />of the City of South Bend and the South Bend Police Department. <br />Alternate D: Bi-Fuel <br />General Product Type: Complete turnkey bi-fuel compressed natural gas/gasoline vehicle <br />conversion which is Department of Transportation, Environmental <br />Protection Agency, and National Fire Protection Agency 52 <br />compliant. <br />Certification: Installation facility shall have a certified gaseous fuel system <br />inspector on staff. Installer to be factory trained and certified by <br />conversion kit manufacturer. Copies of certifications shall be <br />included. Minimum 3 references available upon request. <br />Cylinder enclosures: Any cylinders mounted outside of vehicle shall be enclosed. <br />Cylinder enclosures to be made of minimum 14 gauge steel or <br />equivalent strength material. Any cylinders mounted inside of <br />vehicle shall be enclosed also to keep tanks, valves, plumbing, etc. <br />protected from damage. The material may be wood, aluminum, or <br />plastic finished to match vehicle interior. <br />Cylinder cradles: Cylinder cradles to be made of A36 low carbon steel with a tensile <br />strength of 58,000 PSI. Tank brackets and hangers to meet or <br />exceed NFPA52 standards. <br />Plumbing: A minimum of3/8" seamless stainless steel tubing with a .049 wall <br />thickness with a 4800 P.S.I. working rating and a 20,000 P.S.I. <br />burst pressure is to be used. All high pressure tubing is constructed <br />of stainless steel. All lines are supported with either split block <br />high pressure retaining devices or rubber insulated steel clamps. <br />Wherever movement may be present high pressure hoses that <br />comply with ANSI/IAS, NGV4.2-1999, CSA 12.52 shall be used. <br />Safety check valves to be installed downstream fi•om the fill <br />receptacle and before the cylinders. Manual '/4 turn shut-off valve <br />and mechanical high pressure gauge must be used. Unit shall also <br />have an electrically operated valve at tank. <br />Wiring: All wiring, internal and external, shall be loomed, and properly <br />secured and routed in a professional manner. Any necessary wire <br />splices and or connections shall be soldered and shrink-wrapped, <br />17 <br />