Laserfiche WebLink
Prepared by: Jones Petrie Rafinski <br />ADDENDUM NO. 1 <br />To the Contract Document and Project Specifications for the <br />MONROE PARKING LOT AND STREET IMPROVEMENTS <br />11( 7-043) <br />CITY OF SOUTH BEND, INDIANA <br />Date: May 18, 2017 <br />To: All holders of the contract document for the above project. <br />The items in this addendum are to become a part of the original documents as if included therein. Only <br />the noted items are affected and the remainder of the original contract document is to remain in its <br />entirety. <br />This Addendum modifies the Contract Documents as follows: <br />PART 1 —CLARIFICATIONS <br />PART 2 — SPECIAL PROVISIONS <br />PART 3 — CONSTRUCTION DOCUMENTS <br />PART 1 - CLARIFICATIONS <br />1.01 Attached is the sign -in sheet and meeting agenda from the Pre -bid meeting held on May 9, 2017. <br />1.02 There has been no MBEIWBE percentage goal requirement set for this project. <br />1.03 Contractor shall assure that pedestrian access is provided to the church and the Four Winds <br />Center Field gate at all times. <br />1.04 Contractor shall coordinate construction operations with the South Bend Cubs game day schedule <br />to avoid conflicts between construction activities and pedestrian and vehicular circulation <br />PART 2 — SPECIAL PROVISIONS <br />2.01 Special Provisions, Section XXVII, Common Excavation, Item B, No. 8: <br />1. REPLACE paragraph with the following: Excavation of brick pavers shall be included <br />in the cost of Common Excavation. Full bricks removed from Monroe Street shall be <br />placed on palettes and delivered by the Contractor to the City of South Bend Solid Waste <br />yard. <br />2.02 Special Provision, Section XLVI, Concrete Sidewalk, Item B, No. 5: <br />1. REVISE paragraph to read as follows: Concrete Sidewalk will be paid for at the contract <br />unit price for "Sidewalk, Concrete, —IN ...SYS" as indicated on the itemized proposal <br />sheet. <br />2.03 Special Provision, Section LIII, Liquid Thermoplastic Pavement Marking Paint: <br />1. DELETE Section in its entirety. <br />2. CLARIFICATION: Contractor shall utilized parking lot pavement marking paint to <br />match existing parking located to the south of project site and per City of South Bend <br />Standards. <br />2.04 Special Provision, Section LIV, Light Standards, Item B: <br />1. ADD the following: <br />a. Type C: <br />Monroe Parking Lot and Street Improvements (117-043) Addendum #1 <br />May 18, 2017 Page 1 <br />