My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Memorandum of Understanding - St Joseph County - Coal Line Trail and Portage Avenue Bridge
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Memorandum of Understanding - St Joseph County - Coal Line Trail and Portage Avenue Bridge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 8:26:31 AM
Creation date
5/24/2017 1:49:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
geotechnical investigation, right-of-way acquisition, utility coordination, and other <br />design services necessary to replace the existing bridge and other roadway work that <br />shall meet jurisdictional agency guidelines. <br />3. Project Design — Saint Joseph will retain the services of the selected consultant, <br />execute the agreement and shall pay the design engineer to prepare detailed <br />engineering plans and specifications necessary to enable the construction of such <br />work. The design shall precede based on the removal of the existing bridge structure, <br />replacement with a three -sided reinforced concrete arch structure identified during <br />design process that shall also accommodates the future Coal Line Trail Project and is <br />mutually agreed upon by both parties. <br />d. Right-of-way Acquisition Costs — St. Joseph shall pay the costs of the land <br />acquisition depending on the area of property acquisition required at the time of the <br />land acquisition for the replacement of the structure on Portage over Conrail only. <br />The actual costs for land acquisition shall be identified as the project progresses. At <br />this time, both parties do not anticipate right-of-way acquisition is necessary to <br />complete the project. <br />5. Construction Costs — South Bend agrees to pay St. Joseph for their requested <br />additions and changes to the project. These additional and changed items include the <br />extension of the project limits for a three -lane pavement section, bridge and street <br />ornamental lighting, expanded sidewalks, railing, and other peripheral work requested <br />for the future Coal Line Trail Project. These additions and other offsetting costs are <br />further described in Attachment A --"Portage Avenue Bridge Replacement over <br />Conrail between Diamond Avenue and Elwood Avenue Opinion of Cost <br />Comparison." The actual construction costs shall be identified and refined as the <br />project progresses. <br />6. Construction Inspection Services — St. Joseph will either retain a firm to perform <br />construction inspection services for the project or perform said services in-house. St. <br />Joseph County shall pay for any construction inspection costs and shall provide <br />payment to the construction engineering firm for services rendered. <br />7. Funding: The Project is funded utilizing local funding sources. South Bend and St. <br />Joseph agree to request additional funding addressing respective costs for the project <br />as necessary. Please refer to Attachment A, enclosed hereto, for an estimated cost <br />breakdown. <br />S. Summary: South Bend agrees to pay for the unit pay items identified in Attachment A <br />-- "Portage Avenue Bridge Replacement over Conrail between Diamond Avenue and <br />Elwood Avenue Opinion of Cost Comparison" and any additional pay items from <br />requested changes in work during construction. South Bend acknowledges their <br />commitment on behalf of this agreement is an estimated sum of $52,000.00 based on <br />a proportional share of pay item unit costs for the Project as enumerated in <br />Attachment A. Reimbursement shall be based on each party being ultimately <br />1) <br />
The URL can be used to link to this page
Your browser does not support the video tag.