My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 - Calvert Street Lift Station Replacement Proj No 116-053 - HRP Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 1 - Calvert Street Lift Station Replacement Proj No 116-053 - HRP Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:35:40 PM
Creation date
5/24/2017 1:23:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONSTRUCTION1 <br />EXCAVATING•SEWERS-WATERMAINS <br />•" (Wo&n9 90 -Be of 'S€avice rr <br />REQUEST FOR CHANGE ORDER <br />DATE: March 27, 2017 <br />RFCO #: 2 <br />TO: City of South Bents <br />Attn: Jacob Klosinski <br />3113 Riverside Drive <br />South Bend, IN 46628 <br />PROJECT: Calvert Street Lift Station OWNER: City of South Bend <br />HRP Project: 1483 <br />RE: Request for compensation to ENGINEER: DLZ <br />increase Str #1 from 72" to 96" <br />diameter <br />Description of Request: To have Dyer Vault supply a 96" diameter doghouse manhole for structure #1 as <br />opposed to the 72" diameter doghouse manhole that was called for on the plans. Also <br />included is additional labor, equipment and materials that are needed to complete the <br />change. <br />Basis of Proposal: The project, as designed, is not buildable using a 72" diameter manhole due to the <br />angle of the existing. <br />Description Qtv Unit Unit Price Extension <br />5-man sewer crew with equipment 2 HR $669,00 $1,338.00 <br />Upcharge from Dyer Vault wl mark-up 1 EA $2,185.00 $2,185.00 <br />Class A concrete wl mark-up 4 CY $112.70 $450.80 <br />Total for Change Order <br />$3,973.80 <br />Joe Saggars <br />HRP Construction Inc. <br />Date <br />Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 Phone 574-271-7800 <br />Mailing: P.O. Box 266 South Bend, IN 46624-0266 FAX 574-271.-0524 <br />
The URL can be used to link to this page
Your browser does not support the video tag.