My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quote Opening - Leighton Plaza Improvements, Phase 2 Proj No 117-054A - C&S Masonry Restoration LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Quote Opening - Leighton Plaza Improvements, Phase 2 Proj No 117-054A - C&S Masonry Restoration LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 2:00:30 PM
Creation date
5/19/2017 2:12:52 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i. <br />CITY OF SOUTH BEND, INDIA►NA <br />•> PFACIs .�. <br />CONTRACTOR'S QUOTE E98 PUBLIC WORD <br />M <br />t3fi`� <br />PROJECT NAME: Leighton Plaza Improvements — Phase 2 <br />PROJECT NO. 117.054A <br />QUOTES DUE 05-18-2017 at 10:30 am local time <br />(Must be completed for all quotes. Please type or print) <br />Date: S 1 i g 2 ®1 Firm: C t S "O so'i <br />---- -- - - --- -- <br />Address: ? 2 Ir o �+►� v� "T. o� G T. <br />I Re-5 T*,-A-r1 a.4 LLC <br />City/Statealp: S� 4 ? 4 L64 Telephone Number: (!!�7y ) 2' O 9 -- gi gV <br />Agent of Bidder (if Applicable): NIA <br />Pursuant to notices givers, the undersigned <br />public works project of: <br />L <br />offers to furnish labor and/or <br />VLk?-W <br />necessary to complete the <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated r I ` Z:� 7 - - for the sum of (enter the Total Quote as shown an the Proposal) <br />� r Sum of Total Quote far Division A shown on Proposal) (Numerical) <br />(Enter Sum of Total Quote for vL%Lo—n shown oti Prapaeat) (Numerical) <br />If alternative: quotes apply, the undersigned submits a proposal for each in accordance with the notice, Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material Included in the contract are needed, the cost of units must be the same as that shown <br />In the original contract if accepted by the City of South Bend. If the quote Is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />By C dy # 5-0" A R c S7a� ►3 1ia�✓ <br />(51gnature) <br />CA 5 b,AAsown-`% <br />(Printed Name of Person Signing)r�T� <br />ACCEPTANCE <br />The above quote Is accepted this day of <br />Subject to the fnllovsring cor�dtttons. -- -- - <br />BOARD OF PUBLIC WORKS <br />Gary A. Gllot, President <br />Elizabeth A. Maradik, Member <br />James A. Mueller, Member <br />Suzanne M. F'ritzberg, Member <br />Therese J. Dorau, Member <br />Attest: Linda M. Martin, Clerk <br />20 <br />Version 10l18/2016 Page -10 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.