Laserfiche WebLink
Parcel 108 Permanent Right of Way: <br /> Beginning at a point 37. 7 feet North and 152 feet West of the Southeasterly <br /> corner of Lot Numbered 20 in August Beyer's First Addition to the City of <br /> South Bend, which point is in the Western right of way line of Northside <br /> Boulevard; thence due West to the meandering of St. Joseph River for the <br /> point of beginning of this description: Thence North 150 feet measured <br /> along a straight North and South Line to the North property line of the <br /> Owner's land; thence due East 110 feet along said property line; thence <br /> North 29 degrees 44 minutes East, 38. 4 feet; thence North 33 degrees 03 <br /> minutes West, 254. 2 feet; thence North 12 degrees 37 minutes West, 76. 1 <br /> feet; thence Northwesterly 79. 1 feet along an arc to the right and having a <br /> radius of 235. 3 feet and subtended by a long chord having a bearing of North <br /> 3 degrees 55 minutes West, and a length of 78. 7 feet; thence North 7 degrees <br /> 37 minutes East, 87. 5 feet; thence Northeasterly 166. 9 feet along an arc to <br /> the right and having a radius of 248. 3 feet and subtended by a long chord <br /> having a bearing of North 45 degrees 35 minutes East, and a length of 163. 8 <br /> feet to the Western right of way line of Northside Boulevard; thence North- <br /> westerly 417 feet along said line; thence South 29 degrees 44 minutes East, <br /> 98. 7 feet; thence Southeasterly 195. 0 feet along an arc to the right and <br /> having a radius of 190. 4 feet and subtended by a long chord having a bearing <br /> of South 14 degrees 56 minutes East, and a length of 186. 6 feet; thence <br /> South 14 degrees 24 minutes West, 166. 0 feet; thence Southwesterly 129. 8 <br /> feet along an are to the left and having a radius of 330. 4 feet and subtended <br /> by a long chord having a bearing of South 3 degrees 08 minutes West and a <br /> length of 129. 0 feet; thence South 63 degrees 55 minutes West, 31. 4 feet <br /> to the meandering of the St. Joseph River; thence Southeasterly along said <br /> river to the point of beginning and containing 2. 195 acres, more or less. <br /> NOW, THEREFORE, BE IT RESOLVED that this Council hereby confirms, <br /> ratifies and approves the action of the Board of Public Works in the granting <br /> to the State of Indiana, all reversionary rights and interest of the said below <br /> described real estate, to-wit: <br /> Parcel 108 Limited Access Right of Way: <br /> Beginning at a point on a East West line 187. 7 feet North of the Southeasterly <br /> corner of Lot Numbered 20 in August Beyer Is First Addition to the City of South Bend, <br /> at the intersection of the Western right of way line of Northside Boulevard; thence <br /> due West 127. 9 feet along the South property line of the Owner's land; thence North <br /> 29 degrees 44 minutes East, 38. 4 feet; thence North 33 degrees 03 minutes West, <br /> 254. 2 feet; thence North 12 degrees 37 minutes West, 76. 1 feet; thence Northwesterly <br /> 79. 1 feet along an arc to the right and having a radius of 235. 3 feet and subtended <br /> by a long chord having a bearing of North 3 degrees 55 minutes West, and a length <br /> of 78. 7 feet; thence North 7 degrees 37 minutes East, 87. 5 feet; thence Northeasterly <br /> 166. 9 feet along an arc to the right and having a radius of 248. 3 feet and subtended <br /> by a long chord having a bearing of North 45 degrees 35 minutes East, and a length <br /> of 163. 8 feet to the Western right of way line of Northside Boulevard; thence South- <br /> easterly along said line to the point of beginning and containing 2. 502 acres, more <br /> or less. <br /> ALSO: <br /> The limited access provisions do not apply to the following described right of <br /> way not hereinbefore described as limited access right of way. <br /> -2- <br />