Laserfiche WebLink
ATTACHMENT A <br />Opuuon of Probable Construction Cost for Memorial Hos ital Im rovements <br />A. Opinion of Probable Construction Cost shall be developed for the following improvements <br />(see attached EXHIBIT A): <br />1. Provision of southbound exclusive right turn lane at the intersection of Michigan Street <br />and Bartlett Street, including the signal modification and replacement of curb, sidewalk <br />and tree lawn. Feasibility of relocation of south crosswalk on Michigan Street and option <br />of providing stamped concrete crosswalks on all four approaches, <br />2. Widen Bartlett Street, west of Michigan Street, to provide a westbound left turn for <br />entrance into Bartlett Street Garage. <br />3. Piacemerat/replacement of curb and sidewalks, as needed, on Madison Sheet, between <br />Michigan and Lafayette Boulevard. Milling and overlaying will be required for <br />replacement of curb. <br />4, Placement/rcplacement of curb and sidewalks, as needed, on Marion Street, between <br />Michigan and Lafayette Boulevard. Milling and overlaying will be required for <br />replacement of curb. <br />5. Placement/replacement of curb and sidewalks, as needed, on Lafayette Boulevard, <br />between LaSalle Avenue and Navarre Street. Milling and overlaying will be required for <br />replacement of curb. <br />6. Placement/replacement of curb and sidewalks, as needed, on Main Street, between <br />Madison Street and Navarre Street. Milling and overlaying will be required for <br />replacement of curb. <br />~. Removing concrete infill for the provision of tree lawn on the east side of Michigan <br />Street, between Navarre Street and Bartlett Street, to match the west side of the street. <br />Tlus will also include replacement of sidewalk and curb, as necessary. Milling and <br />overlaying will be required for replacement of curb. <br />8. Removing concrete infill for the provision of tree lavm on the east and west sides of <br />Michigan Street, between Madison Street and LaSalle Avenue. This will also includc <br />replacement of sidewalk and curb, as necessary. Milling and overlaying will be required <br />for replacement of curb. <br />9. Removing concrete infill for the provision of tree lawn on the north side of Navarre <br />Street, between Michigan Street and St. Joseph Street. Tl1is will also include replacement <br />of sidewalk and curb, as necessary. Milling and overlaying will be required for <br />replacement of curb. <br />10. Removing concrete infill for the provision of tree lawn on the south side of Bartlett <br />Street, between Michigan Street and St. Joseph Street. This will also include replacement <br />of sidewalk and curb, as necessary. Milling and overlaying will be required for <br />replacement of curb, <br />1 1. ADA compliant curb ramps at the intersections of Michigan Street with Bartlett Street <br />and Navarre Street, <br />12. Sidewalk replacement, between Michigan Street and entrance to Bartlett Street parking <br />garage, to meet the grade requirements. Milling and overlaying will be required for <br />replacement of sidewalk. <br />13. Close the access to old Pizza Hut Building on the east side of Michigan Street north of <br />Page 1 of 2 ATTACHMENT A <br />