My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-14-09 Capital budget to increase, yet stay below historic levels
sbend
>
Public
>
News Releases
>
2009
>
12-14-09 Capital budget to increase, yet stay below historic levels
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2009 8:22:43 AM
Creation date
12/15/2009 8:22:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />“It is important for the City to invest in capital projects to keep our equipment and <br />facilities safe and efficient, preventing much larger expenses later on. Tight budget <br />constraints have hampered our ability to fully fund capital expenditures on par with our <br />annual depreciation level of $21.2 million,” said City Controller Gregg Zientara. “When <br />the Common Council approved an increase in the economic development local option <br />income tax, that provided an additional resource for capital, and Mayor Luecke requested <br />that we set those resources aside for reinvestment in City equipment, facilities and <br />infrastructure.” <br /> <br />Engineering improvements account for the largest portion, 19 percent, of the $9,898,803 <br />in expenditures, followed by investments in the Fire and Police departments, about 12 <br />percent each, respectively. <br /> <br />The largest single engineering project, $635,000, will widen and improve Cotter Street <br />from Prairie Avenue to Kendall Street to serve Ignition Park. It is being paid primarily by <br />federal dollars and the project will be let by the Indiana Department of Transportation. <br />Traffic signals will be modernized along Mishawaka Avenue and Western Avenue with <br />the City’s 20 percent share supporting a federal investment of $1.6 million. <br /> <br />The Northside Trail will be extended from Indiana University South Bend to connect <br />with the western terminus of Mishawaka’s Riverwalk. Federal aid will cover $1.5 million <br />of the project. Next year will see the first of three years’ worth of improvements to Ewing <br />Avenue from Meade Street to Michigan Street. The annual project cost of $4 million is <br />supplemented by $600,000 from the City to complete design work. <br /> <br />On the west side, the intersection of Western Avenue and Olive Street will be improved <br />with the addition of a protected turn lane as part of a $400,000 project. The city’s GIS <br />system also will receive a $100,000 investment for maintenance and upgrades. (The <br />Street Department also requested a capital allocation of $893,050 – $300,000 devoted to <br />concrete repairs and the balance for replacement or maintenance of equipment.) <br /> <br />The Fire Department’s largest single expenditure is $181,164 over five years to purchase <br />a new quintuple combination pumper to replace a 1986 unit. The “quint” serves the dual <br />purpose of an engine and a ladder truck, providing five functions: pump, water tank, fire <br />hose, aerial device and ground ladders. Fire also has requested: <br />? <br /> <br />$125,000 for renovation and expansion of Fire Station No. 5, 2221 Prairie Ave., <br />the city’s second oldest fire station, built in 1954. An additional $100,000 is <br />allocated for maintenance at all of the City’s 11 fire stations. <br />? <br /> <br />$124,000 for a new firefighter escape system, life safety equipment that has not <br />been provided by grants. <br />? <br /> <br />$140,746 for the first of two years toward purchasing a new rescue and <br />ambulance unit. <br />? <br /> <br />$375,000 for a new pumper to replace a 1991 pumper (which, in turn, would <br />replace a 1973 reserve pumper). <br /> <br />The Police Department will continue scheduled replacement of 35 patrol cars in 2010 at a <br />cost of $770,000 including five hybrid cars for use by administrators or detectives. It also <br />will spend $50,000 to replace Tasers and $8,000 to replace radios. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.