My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2017 Curb and Sidewalk Construction Proj No. 117-008- Ziolkowski Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - 2017 Curb and Sidewalk Construction Proj No. 117-008- Ziolkowski Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 8:32:33 AM
Creation date
5/10/2017 10:14:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/9/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Division D <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />522 <br />SY <br />7 <br />3,654 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />522 <br />SY <br />43 <br />22,446 <br />3 <br />CONCRETE CURB, REMOVE <br />1628 <br />LF <br />6 <br />9,768 <br />4 <br />CONCRETE CURB, MODIFIED <br />1628 <br />LF <br />26 <br />42 328 <br />5 <br />CONCRETE APPROACH, REMOVE <br />31 <br />SY <br />7 <br />217 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />31 <br />SY <br />70 <br />2,170 <br />7 <br />CURB RAMP, REMOVE <br />61 <br />SY <br />7 <br />427 <br />8 <br />PAIRED PERPENDICULAR CURB <br />RAMP <br />61 <br />SY <br />70 <br />4,270 <br />9 <br />TREE, REMOVE, 18-IN <br />4 <br />EA <br />400 <br />1,600 <br />10 <br />TREE, REMOVE, 30-IN <br />3 <br />EA <br />1100 <br />3,300 <br />11 <br />TREE, REMOVE, 48-IN <br />1 <br />EA <br />1500 <br />1,500 <br />12 <br />STUMP, REMOVE <br />1 <br />EA <br />150 <br />150 <br />13 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM, 2-IN TO 2.5-IN <br />9 <br />EA <br />330 <br />2,970 <br />14 <br />TOPSOIL AND SEEDING <br />667 <br />SY <br />14 <br />9,338 <br />DIVISION D TOTAL 104,138 <br />Division E <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />211 <br />SY <br />7 <br />1,477 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />211 <br />SY <br />43 <br />9,073 <br />3 <br />CONCRETE CURB, REMOVE <br />300 <br />LF <br />6 <br />1,800 <br />4 <br />CONCRETE CURB, MODIFIED <br />300 <br />LF <br />26 <br />7,800 <br />5 <br />CONCRETE APPROACH, REMOVE <br />23 <br />SY <br />7 <br />161 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />23 <br />SY <br />70 <br />1,610 <br />7 <br />CURB RAMP, REMOVE <br />33 <br />SY <br />7 <br />231 <br />8 <br />DEPRESSED CORNER CURB RAMP <br />45 <br />SY <br />75 <br />3,375 <br />9 <br />TOPSOIL AND SEEDING <br />53 <br />SY <br />42 <br />2,226 <br />DIVISION E TOTAL 27,753 <br />Bidder (Firm): Ziolkowski Construction, Inc. <br />Version 10/17/2016 Contractor's Bid for Public Works - 9 Project 117-008 —Addendum ##1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.