My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04252017 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2017
>
04252017 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:35:27 PM
Creation date
5/9/2017 2:30:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />APRIL 25, 2017 116 <br />1 <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Bid Bond was not submitted. <br />on <br />Description Year/Make/Model Unit Price <br />2018 Transit Connect LWB $22,989.00 <br />Alternate # <br />Description <br />Cost <br />Total <br />1 <br />Federal Signal Light bar model: 45" <br />$2,169.00 <br />$2,169.00 <br />Legend L PX mounted to rear of roof <br />and wired with Federal Signal <br />controller. Exact placement of light <br />bar and controller to be determined by <br />Central Services <br />2 <br />Four corner LED strobe lights surface <br />$618.00 <br />$618.00 <br />mounted <br />Estimated number of days for delivery from award date: 90-120 <br />GATES CHEVROLET <br />636 W. McKinley Avenue <br />Mishawaka, IN 46545 <br />Bid was signed by: Chris Dill <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Bond was submitted. <br />BID: <br />Description Year/Make/Model Unit Price <br />3 2018 Chevrolet City Express $23,513 <br />Alternate # <br />Description <br />Cost <br />Total <br />1 <br />Federal Signal Light bar model: 45" <br />$1,344 <br />$4,032 <br />Legend L PX mounted to rear of roof <br />and wired with Federal Signal <br />controller. Exact placement of light <br />bar and controller to be determined by <br />Central Services <br />2 <br />Four corner LED strobe lights surface <br />$565 <br />$1695 <br />mounted <br />11UHIVIF11 01. days iur uenvery rrom award date: Approximately 120 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were <br />referred to Central Services for review and recommendation. <br />OPENING OF BIDS — WESTERN AVENUE CORRIDOR IMPROVEMENTS— PROJECT <br />NO. 115-097 (RWDA TIF) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids were opened and publicly <br />read: <br />WALSH & KELLY, INC <br />24358 SR 23 <br />South Bend, IN 46614 <br />Bid was signed by: Dustin Hilary <br />
The URL can be used to link to this page
Your browser does not support the video tag.