My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Berlin Place #2 Electrical - CBS Service, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Berlin Place #2 Electrical - CBS Service, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 8:45:43 AM
Creation date
5/5/2017 9:36:35 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/4/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P -BID CONFERENCE AGENDA <br />RE <br />Project: 117-048M Berlin Place — BP#2 Mechanical <br />Project: 117-048E Berlin Place — BP#2 Electrical <br />Project: 117-048P Berlin Place — BP#2 Plumbing <br />April 25, 2017 <br />11:30 a.m. (Local Time) <br />1. Welcome and Introductions <br />Sign -in <br />Patrick C. Kerr, Design and Administration — City of South Bend (574-235-5931) <br />Ryan Fitzpatrick — TWG Construction, LLC <br />Eric Tanner — TWG Construction, LLC <br />Direct all questions, in writing, during bidding: <br />Patrick Kerr, City of South Bend Public Works, pckerr(cDsouthbend in. gov <br />Questions due by 5:00 p.m. (Local Time) April 26, 2017 <br />II. Project(s) Overview <br />There are 3 separate distinct and independent projects out for bid. A bidder may bid on <br />more than one project. <br />Each project shall be carried out under one prime contract. <br />Base Bid: Work to be performed shall include furnishing all labor, services, materials, <br />insurance and equipment to provide (Electrical 117-048E; Mechanical 117-048M; <br />Plumping 117-048P) services according to the intent of the plans and specifications at <br />"The Ivy at Berlin Place" project located at the corner of Lafayette Blvd and Western Ave <br />in South Bend, IN. — Special Provisions Section XXI.13.1 <br />III. Critical Schedule <br />The project will have a completion date of March 20th, 2018 for Building 2, April 10th, <br />2018 for Building 1, April 24th, 2018 for Building 3, and May 81h, 2018 for Building 4. The <br />contract time will start when the Notice to Proceed is delivered and signed. -- Special <br />Provisions Section XIII.B.1 <br />Liquidated Damages - $5001 calendar day — Special Provisions Section XVI.B.2 <br />IV. Bidding Overview <br />Plans and Specifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.