My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - DLZ Indiana - Tucker Dr Topographic & Olive St Improvements Legal Descriptions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - DLZ Indiana - Tucker Dr Topographic & Olive St Improvements Legal Descriptions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:35:44 AM
Creation date
4/26/2017 9:21:51 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is Exhibit D, consisting of 1 page, <br />referred to in and part of the Short Form of <br />Agreement between Owner and Engineer for <br />Professional Services dated April 25, 2017. <br />Engineer's Project Schedule <br />A. After receiving a written notice to proceed the Engineer shall: <br />1. DLZ will deliver a CAD file of the topographic survey within 14 calendar <br />days after receipt of our Notice to Proceed. <br />2. The boundary survey and legal description shall be delivered within 30 <br />calendar days of our receipt of the proposed right of way lines. <br />3. The Post Construction As -Built Survey will be delivered within 14 calendar <br />days of receipt of notification that construction is compete. <br />Exluibi1 D <br />EJCDC E-520 short Form of Agreement Between Owner and Engineer for Professional services. <br />Copyright 02009 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.