My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 - Corby Blvd. Sidewalk Improvements Division A.B.C - Proj No 116-087 - Rieth Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 1 - Corby Blvd. Sidewalk Improvements Division A.B.C - Proj No 116-087 - Rieth Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:35:49 PM
Creation date
4/26/2017 8:46:15 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 1 <br />CORBY STREET SIDEWALK <br />Project No. 116-087 <br />OWNER: City of South Bend <br />ENGINEER: Jones Petrie Rafinski <br />Chris Chockley, RLA <br />Registered Landscape Architect No, 20500170 <br />CONTRACTOR: Rieth Riley <br />PROJECT: Corby Street Sidewalk Installation <br />Project No. 116-087 <br />SUBJECT: Existing Driveway Modification for ADA Cross Slope Issues <br />and an increase of 17 CYS for Borrow quantity. <br />ISSUE DATE: March 21, 2017 <br />This Change Order to the Contract document shall supplement, amend, and shall become a part of, <br />and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change Order: <br />1. Existing driveways to be removed and reinstalled as part of Corby <br />Street Sidewalk Project. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS: <br />1. Bid/Proposal Form: <br />ADD 203 SYS of DRIVEWAY, CONCRETE, REMOVE, SYS @ $35.00 <br />ADD 203 SYS of DRIVEWAY, CONCRETE, 6 IN OVER SUBGRADE, SYS @ $50.00 <br />ADD 17 CYS of BORROW, CYS @ $250.00 <br />SPECIFICATIONS: <br />NO CHANGE REQUIRED <br />
The URL can be used to link to this page
Your browser does not support the video tag.