Contractor's Bid for Public Work - City of South Bend
<br />Project No. 115-097
<br />Addendum No. 02
<br />April 2017
<br />72.
<br />Trash Receptacle
<br />1
<br />EACH
<br />$ 2,700,00
<br />$2,700,00
<br />73.
<br />Bike Hitch
<br />10
<br />EACH
<br />$ 375.00
<br />$3,750.00
<br />74.
<br />Bench
<br />2
<br />EACH
<br />$ 3,750,00
<br />$7,500,00
<br />75.
<br />Concrete Planter
<br />10
<br />EACH
<br />$ 1,100.00
<br />$11,000,00
<br />76.
<br />Delineator Posts, Furnish
<br />25
<br />EACH
<br />$ 25.00
<br />$625.00
<br />77.
<br />Delineator Posts, Furnish and Install
<br />27
<br />EACH
<br />$ 35.00
<br />$945.00
<br />78,
<br />Storm Sewer Pipe, 12"
<br />2,159
<br />LFT
<br />$ 47.50
<br />$102,552.60
<br />79,
<br />Storm Sewer Pipe, 12" Water Main Grade Pipe
<br />147
<br />LFT
<br />$ 65.00
<br />$9,555.00
<br />80.
<br />Storm Sewer Pipe, 12" Perforated Pipe
<br />1,069
<br />LFT
<br />$ 45.75
<br />$48,906.75
<br />81,
<br />Standard Inlet, 30"
<br />22
<br />EACH
<br />$ 1,875.00
<br />$41,260.00
<br />82.
<br />Standard Manhole
<br />7
<br />EACH
<br />$ 2,700.00
<br />$18,900.00
<br />83.
<br />Water Main, DIP, 6"
<br />190
<br />LFT
<br />$ 70.75
<br />$13,442.50
<br />84.
<br />Water Main, DIP, 12"
<br />1,475
<br />LFT
<br />$ 82,75
<br />$122,056.25
<br />85,
<br />Water Main, DIP, 16"
<br />65
<br />LFT
<br />$ 214.25
<br />$13,926.25
<br />86.
<br />Water Main, DIP, 24"
<br />30
<br />LFT
<br />$ 434.00
<br />$13,020.00
<br />87.
<br />Gate Valve, 6"
<br />3
<br />EACH
<br />$ 1,025.00
<br />$3,075,00
<br />88.
<br />Gate Valve, 12"
<br />4
<br />EACH
<br />$ 2,550.00
<br />$10,200.00
<br />89.
<br />Butterfly Valve, 16"
<br />1
<br />EACH
<br />$ 2,950.00
<br />$2,950.00
<br />90.
<br />Butterfly Valve, 24"
<br />1
<br />EACH
<br />$ 5,850.00
<br />$5,850.00
<br />91.
<br />Inserta Valve, 12"
<br />4
<br />EACH
<br />$ 11,000.00
<br />$44,000,00
<br />92.
<br />Line Stop, 16"
<br />1
<br />EACH
<br />$ 11,500.00
<br />$11,500.00
<br />93.
<br />Line Stop, 24"
<br />1
<br />EACH
<br />$ 16,750.00
<br />$16,750.00
<br />94.
<br />6" Bend, 45 Degree
<br />4
<br />EACH
<br />$ 295.00
<br />$1,180.00
<br />95.
<br />12" Bend, 45 Degree
<br />4
<br />EACH
<br />$ 750.00
<br />$3,000.00
<br />96.
<br />16" Bend, 45 Degree
<br />2
<br />EACH
<br />$ 1,400.00
<br />$2,800.00
<br />97.
<br />24" Bend, 45 Degree
<br />2
<br />EACH
<br />$ 2,900.00
<br />$6,800.00
<br />98,
<br />Cross, 12" x12"
<br />2
<br />EACH
<br />$ 2,075.00
<br />$4,150.00
<br />99.
<br />Reducer, 6" x 12"
<br />1
<br />EACH
<br />$ 475.00
<br />$475.00
<br />100.
<br />Reducer, 12" x 16'.
<br />1
<br />EACH
<br />$ 1,025,00
<br />$1,025,00
<br />101.
<br />Reducer 12" x 24"
<br />1
<br />EACH
<br />$ 2,100,00
<br />$2,100,00
<br />102.
<br />Plug, 6"
<br />1
<br />EACH
<br />$ 275.00
<br />$275.00
<br />103.
<br />Plug, 12"
<br />1
<br />EACH
<br />$ 460.00
<br />$460.00
<br />104.
<br />Water Service, 1" Type K Copper, Open Cut
<br />790
<br />LFT
<br />$ 15.00
<br />$11,860,00
<br />105.
<br />Water Service, 1" Type K Copper, Drilled
<br />280
<br />LFT
<br />$ 51.00
<br />$14,280.00
<br />106.
<br />Curb Stop, 1"
<br />34
<br />EACH
<br />$ 1,160.00
<br />$39,440.00
<br />107,
<br />Fire Hydrant Assembly
<br />2
<br />EACH
<br />$ 4,600.00
<br />$9,200.00
<br />108.
<br />Adjust Casting to Grade
<br />20
<br />EACH
<br />$ 790.00
<br />$15,800.00
<br />109.
<br />Construction Sign, Wayfinding Signs
<br />52.5
<br />SFT
<br />$ 8.00
<br />$420.00
<br />110,
<br />Maintaining Traffic
<br />1
<br />LS
<br />$ 28,165.00
<br />$28,165.00
<br />111.
<br />TESCO Combination Cabinet on Existing Foundation
<br />1
<br />EACH
<br />$ 7,400.00
<br />$7,400.00
<br />112.
<br />4-1Ic No. 4 Copper Cable
<br />6,570
<br />LFT
<br />$ 6.00
<br />$39,420.00
<br />Bidder's Name: Selge Construction Co., Inc.
<br />Version 7-31/2015 Contractor's Bid For Public Works-9
<br />
|