Laserfiche WebLink
Contractor's Bid for Public Work - City of South Bend <br />Project No. 115-097 <br />Addendum No. 02 <br />April 2017 <br />29. <br />Unsuitable Material Excavation <br />750 <br />CYD <br />Jd(, pp <br />Mb. 00 <br />30. <br />Milling, Variable Depth <br />5,160 <br />SYD <br />L//(p, tOo <br />31. <br />Coarse Aggregate, No. 8 <br />800 <br />CYD <br />J p,pp <br />/ a7a 04)e, po <br />32. <br />Compacted Aggregate for Base, No, 53 <br />1,340 <br />TON <br />1Q0A <br />33. <br />Compacted Agg, for Base, No. 53 for Patching, Undistributed <br />290 <br />TON <br />J 6,(,), 00 <br />CJ DO. oo <br />34. <br />HMA for Patching, Undistributed <br />440 <br />TON <br />i�t�,Or) <br />�(p 0"). ex} <br />35, <br />HMA for Wedge and Level <br />4,300 <br />W SYD <br />5,.2-5 <br />36., E/ f-c• p p <br />36. <br />HMA Surface, 9.5 mm, Type B <br />110 <br />TON <br />q&, oo <br />jL-) ,54, ev <br />37. <br />HMA Intermediate, 19.5 mm, Type B <br />45 <br />TON <br />38. <br />HMA Base, 25.0 mm, Type B <br />85 <br />TON <br />39. <br />PCCP, 10" <br />1,580 <br />SYD <br />gyp, OeD <br />© &Vo- CO <br />40. <br />PCCP, 10", Mainline <br />1,095 <br />SYD <br />(p�, Op <br />&-7 R -00 <br />41. <br />Sidewalk, Concrete, 4" <br />2.,860 <br />SYD <br />3,S, Oil <br />/cv, UO <br />42. <br />Permeable Brick Pavers, Sidewalk <br />260 <br />SYD <br />{ ,� �Q <br />.SJv DD <br />43. <br />Curb Ramp, Concrete <br />130 <br />SYD <br />/q45, O p <br />F &, pO <br />44. <br />Concrete Curb, 6" <br />2,565 <br />LFT <br />©p <br />Zf •ram, �a <br />45. <br />Concrete Curb, 8" <br />125 <br />LFT <br />30, OCR <br />3, 751). pp <br />46. <br />Concrete Ribbon Curb <br />1,300 <br />LFT <br />f5, DU <br />ex. 00 <br />47. <br />PCCP for Approaches, 6" <br />630 <br />SYD <br />c�(�. 00 <br />48. <br />PCCP for Approaches, 8" <br />75 <br />SYD <br />49. <br />Permeable Pavers <br />1,070 <br />SYD <br />50. <br />Geogrid <br />2,140 <br />SYD <br />3,00 <br />V. C7 o <br />51. <br />Geotextile Fabric <br />7,490 <br />SYD <br />52. <br />Sodding <br />850 <br />SYD <br />gip, Ic <br />3 L�gS.ao <br />53. <br />Steel Edging <br />190 <br />LFT <br />d <br />O pp <br />54. <br />Mulch <br />15 <br />CYD <br />q6, OD <br />c( Q75. c)o <br />55. <br />Tree, Protect <br />1 <br />LSUM <br />� po, D o <br />,94)0 . 0 o <br />56. <br />Shrub, Winter Gem Boxwood, 24" Ht <br />75 <br />LFT <br />i -, pO <br />if 3 5. Coo <br />57. <br />Shrub, Golden Globe Arborvitae, 24" Ht. <br />90 <br />LFT <br />26. D <br />40, C)o <br />58. <br />Perennial, Little Blustem, 2 Gal <br />3 <br />EACH <br />0 p <br />59. <br />Tree, Skyline Honeylocust, 2.5" <br />10 <br />EACH <br />t)o, p O <br />(xoo . p D <br />60. <br />Tree, Autumn Brilliance Serviceberry, 1.5" <br />9 <br />EACH <br />61. <br />Tree,Homestead Elm, 2.5" <br />7 <br />EACH <br />&C) UCH <br />gepo. oc) <br />62. <br />Tree, Common Hackberry, 2.5" <br />5 <br />EACH <br />1001 1) <br />604). po <br />63. <br />Tree, Freeman, Red Maple, 2.5" <br />2 <br />EACH <br />~70�. pU <br />U©, 00 <br />64, <br />Tree, Red Oak, 2.5" <br />3 <br />EACH <br />loo, <br />65. <br />Tree, Thornless Cockspur Hawthorn, 1.5" <br />4 <br />EACH <br />�O <br />66. <br />Tree Grate and R-8500-P Frame <br />9 <br />EACH <br />j C(d , /12 <br />67. <br />Decorative Picket Fence, 3' <br />195 <br />LFT <br />j/ ' 00 <br />SCJO, OO <br />68. <br />Decorative Picket Fence, 4' <br />�200 <br />1 LFT <br />( OO <br />600, OO <br />69. <br />Decorative Picket Fence, 6' <br />50 <br />LFT <br />/ q , <br />pp <br />Bidder's Name: HRP CONSTRUCTION INC. <br />Version 7-3112015 Contractor's Bid For Public Works-8 <br />