Contractor's Bid for Public Work - City of South Bend
<br />Project No. 115-097
<br />Addendum No. 02
<br />April 2017
<br />111.
<br />TESCO Combination Cabinet on Existing Foundation
<br />1
<br />EACH
<br />,7 LIDO• U��
<br />L/Qf>. fDr�
<br />112.
<br />4-11c No. 4 Copper Cable
<br />6,570
<br />LFT
<br />113,
<br />2" PVC Schedule 80 for Lighting
<br />5,790
<br />LFT
<br />(p .C90
<br />3 Cf q6j, QU
<br />114.
<br />2" PVC Schedule 80 for Lighting, Directionally Drilled
<br />475
<br />LFT
<br />f p, pD
<br />[ TeSO. DV
<br />115.
<br />Light Pole Foundation
<br />51
<br />EACH
<br />&,20,00
<br />( &_Q0. c)o
<br />116.
<br />Light Pole and Luminaire, LED, Type 1, Furnish
<br />2
<br />EACH
<br />t9m, pry
<br />Oo epp
<br />117.
<br />Light Pole and Luminaire, LED, Type 2, Furnish
<br />8
<br />EACH
<br />_� DU D©
<br />'5c7 JC7f3_C,ra
<br />118.
<br />Light Pale and Luminaire, LED, Type 1, Furnish and Install
<br />40
<br />EACH
<br />dyp 00
<br />dD (dap, Oct
<br />119.
<br />Light Pole and Luminaire, LED, Type 2, Furnish and Install
<br />11
<br />EACH
<br />g00, vp
<br />(p qCo, np
<br />120.
<br />Lighting Handhole
<br />2
<br />EACH
<br />-16"Z oe)
<br />1 624 pp
<br />121.
<br />Miscellaneous Equipment for Lighting
<br />1
<br />L5
<br />�GY3
<br />Cfd, go
<br />122.
<br />Drilled Shaft Foundation Type B
<br />1
<br />EACH
<br />ci 0Do. oo
<br />L Oct). Do
<br />123.
<br />Signal Cantilever Structure and Mast Arm 35', Install
<br />1
<br />EACH
<br />124.
<br />Traffic Signal Head, 3 Section, 12 IN
<br />1
<br />EACH
<br />�JDD. DQ
<br />�G7p. [7U
<br />125.
<br />Traffic Signal Head, 3 Section, 12 IN, Relocate
<br />1
<br />EACH
<br />126.
<br />Traffic Signal Head, 5 Section, 12 IN, Relocate
<br />_ 1
<br />EACH
<br />Cj,Df7
<br />`.gib. pC1
<br />127.
<br />Traffic Signal Handhole �s
<br />1
<br />EACH
<br />1 bp, DD
<br />f 1 UO. Oo
<br />128.
<br />Signal Wire, 5c114
<br />425
<br />LFT
<br />W
<br />p
<br />'O O U
<br />129.
<br />Signal Wire, 7c114
<br />235
<br />LFT
<br />v
<br />7y,5, tDo
<br />130,
<br />2" PVC Schedule 80 for Signal Wiring, Directionally Drilled
<br />180
<br />LFT
<br />, Up
<br />9g0. Ov
<br />131.
<br />Painting Traffic Signal Equipment
<br />1
<br />EACH
<br />DO.dka4
<br />q0c)-o")
<br />132,
<br />Sheet Sign, 0.080 in.
<br />1
<br />EACH
<br />�yD
<br />CCU
<br />133.
<br />Tree, Greenspire Linden, 2.5"
<br />1
<br />EACH
<br />�)�(�.b p
<br />T �O , no
<br />134.
<br />Sign Post, Square, Type 2, Reinforced Anchor Base
<br />70
<br />LFT
<br />��, bD
<br />pp
<br />136.
<br />Pavemet Markings, Remove
<br />T700
<br />LFT
<br />1.06
<br />-1 vex, 60
<br />136.
<br />Line, Epoxy, Solid, White, 4"
<br />340
<br />LFT
<br />U p
<br />3 elo. oo
<br />137.
<br />Line, Epoxy, Solid, Yellow, 4"
<br />3,460
<br />LFT
<br />j . 60
<br />3, Cf O, pU
<br />138.
<br />Line, Epoxy, Solid, White, 6"
<br />930
<br />LFT
<br />3,00
<br />Oa pD
<br />139.
<br />Line, Epoxy, Broken, Yellow, 4"
<br />422
<br />LFT
<br />f , [� p
<br />r%. U U
<br />140.
<br />Transverse Line, Preformed Plastic, White, 24", Stop Bar
<br />166
<br />LFT
<br />/�, pp
<br />qqd, pU
<br />141
<br />Pavement Message Marking, Preformed Plastic, Lane
<br />Indication Arrow
<br />11
<br />EACH
<br />1 76, OQ
<br />vo
<br />142,
<br />Pavement Message Marking, Preformed Plastic, Sharrow
<br />6
<br />EACH
<br />100. &0
<br />143.
<br />HMA for Patching
<br />140
<br />TON
<br />(..Coo. p e.)
<br />144,
<br />PCCP, 4" Overlay
<br />4,300
<br />SYD
<br />�` Q, pry
<br />%a�V&), p6
<br />145.
<br />Inserta Valve, 6"
<br />1
<br />t)o
<br />Total Amount of Base Bid (Items 1 through 145)
<br />Bidder's Name: HRP CON5TRt1CTTON INC.
<br />Version 7-31/2015 Contractor's Bid For Public Works-10
<br />
|