Laserfiche WebLink
Manuals: <br />Included with the machine shall be an operator's manual tethered in a storage container arced <br />to the machine. In addition, an operator's manual, maintenance and parts manuals will be <br />provided. <br />Tool Kit: <br />Unit to include a basic tool kit and grease gun with all tools necessary to perform required <br />maintenance and making simple repairs. <br />Parts List: <br />Unit to include complete list of mahenance items such as fluids, filters, belts, etc. List shall <br />also include wearable items like teeth or blades. <br />Training: <br />Vendor to include all set-up, machine operation and preventative maintenance training at the <br />compost facility and will remain onsite until acceptance of the turner is complete. Training to <br />include up to 16 hours of operator training and 16 hours of technician training. <br />uant <br />One (1) or more <br />Alternates: <br />Alternate 1: Two (2) 4" round 6 x 9 diamond screens <br />Alternate 2: Air Compressor <br />Alternate 3: Heavy Duty Belt <br />Alternate 4: Cab and loader unit with all necessary upgrades to unit <br />Alternate 5: Extended Warranty <br />Alternate 6: Work Light Package <br />13 <br />