Laserfiche WebLink
Bidder; Gibson -Lewis, LLC <br />QUOTEIPROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME Leighton Plaza Improvements <br />PROJECT NO. 117-054 <br />QUOTES DUE 04-11-2017 <br />Item <br />No. <br />Description. <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Mobilization and Demobilization <br />1 <br />LS <br />50,781 10 <br />$ 50,781.10 <br />2 <br />Existing Medallion, Remove <br />1 <br />LS <br />5,474,60 <br />$ 5,474.60 <br />3 <br />Brick Pavers, Remove <br />20 <br />SYS <br />443.30 <br />8,866.00 <br />4 <br />Earthwork, Common <br />1 <br />LS <br />10,586.50 <br />10,586.50 <br />5 <br />Aggregate Subbsae, No. 53 <br />1 <br />CYD <br />2,278.50 <br />2,278.50 <br />6 <br />Pavement, Concrete, 8 IN <br />7 <br />SFT <br />511.50 <br />3,580.50 <br />7 <br />Concrete Base, 12 IN <br />21 <br />SFT <br />300.70 <br />6,314.70 <br />8 <br />Concrete Slab for Fountain <br />60 <br />SFT <br />53.17 <br />3,189.90 <br />9 <br />Brick Pavers <br />93 <br />SFT <br />8525 <br />7,928,25 <br />10 <br />Concrete Core, 1" DIA <br />8 <br />LFT <br />193.75 <br />1,550.00 <br />11 <br />Concrete Core, 2" DIA <br />2 <br />LFT <br />775.00 <br />1,550.00 <br />12 <br />Ingrade Lights <br />2 <br />Each <br />1,816.60 <br />3,633.20 <br />13 <br />Flood Flight Fixtures <br />2 <br />Each <br />2,048.33 <br />4,096.66 <br />14 <br />Time Clock <br />2 <br />Each <br />1,122.20 <br />2,244.40 <br />15 <br />Misc Electrical <br />1 <br />LS <br />4,595.75 <br />4,595.75 <br />16 <br />Electrical Conduit, Y4" Sch 80 <br />45 <br />LFT <br />6.40 <br />288.07 <br />17 <br />Water Line, 3/" PE CTS DR9 <br />50 <br />LFT <br />24.80 <br />1,240.00 <br />18 <br />Drain Line, 1 1/" Sch 40 PVC <br />5 <br />LFT <br />31.00 <br />155.00 <br />19 <br />Water Fountain <br />1 <br />Each <br />9,501 50 <br />9,501,50 <br />20 <br />Water Fountain Equipment <br />1 <br />LS <br />3,100.00 <br />3,100,00 <br />Version 10/18/2016 <br />Page - 11 Public Works Quote <br />