Laserfiche WebLink
= VSENGINEERING, INC. <br />Civil k Structural . Transportation 7vironm <br />ental <br />Olive Street Pavement Reconstruction Page 2 of 2 <br />TITLE RESEARCH AND RIGHT-OF-WAY PLAN DEVELOPMENT SERVICES: <br />Task <br />Rate <br />Comment <br />T&E Reports (Permanent Taking) <br />$450.00 <br />Per each State Tax Id. Number Researched <br />T&E Reports (Temporary Taking) <br />$275.00 <br />Per each State Tax Id. Number Researched <br />Title Updates <br />$250.00 <br />Per each State Tax Id. Number Researched <br />Right-of-way Engineering (Permanent) <br />$2,450.00 <br />Owner(s) Initial Parcel <br />Addn. Right-of-way Engineering (Perm-C) <br />$1,400.00* <br />Additional Contiguous Parcel of the Same Owner <br />Addn. Right-of-way Engineering (Perm -NC) <br />$1,800.00* <br />Additional Non -Contiguous Parcel of the Same Owner <br />Right-of-way Engineering (Temporary) <br />$2,250.00 <br />Owner(s) Initial Parcel <br />Addn. Right-of-way Engineering (Temp-C) <br />$1,100.00* <br />Additional ContiguousParcel of the Same Owner <br />Addn. Right-of-way Engineering (Temp -NC) <br />$1,500.00* <br />Additional Non -Contiguous Parcel of the Same Owner <br />Right-of-way Staking <br />$650.00 <br />Owner(s) Initial Parcel(s) <br />Right-of-way Staking-C <br />$200.00* <br />Additional Contiquous Parcel of the Same Owner <br />Addn, Right-of-way Staking -NC <br />$350.00* <br />Additional Non -Contiguous Parcel of the Same Owner <br />Eliminate Parcel Due to No Take <br />$612.50 <br />To Eliminate Parcel Once Created in LRS <br />Revision to Any Parcel <br />$1,225.00 <br />Revision Due to Design Change <br />* Initial parcel of the owner(s) land will be invoiced per the defined initial unit fee. If applicable: Any additional conti uous <br />ornon-contiguous parcels of the same owner(s) will be invoiced per this fee on a per each basis. <br />ESTIMATED FEE (20 Parcels (Owners) — 37 State Tax Ids.): <br />(Total fee to be increased or decreased upon determination of exact number of parcels) <br />Task <br />Rate Quantily Fee <br />T&E Reports (Permanent) ................. <br />$450.00 ...... 37 .......... <br />$16,650.00 <br />Title Updates ........................... <br />$250.00 ...... <br />37 .......... <br />$9,250.00 <br />RIW Engineering (Permanent) .............. <br />$2,450.00 .... <br />9 ........... <br />$22,050.00 (VSEI Portion) <br />Addn. Right-of-way Engineering (Perm-C) ..... <br />$1,400.00 .... <br />14 .......... <br />$19,600.00 (VSEI Portion) <br />Right-of-way Staking ...................... <br />$650.00 ...... <br />20 .......... <br />$13,000.00 <br />Right-of-way Stakin -C .................... <br />200.00 ...... <br />17 .......... <br />3,400.00 <br />TOTAL .... <br />$83,950.00 <br />J:\Survey\Proposals\2015\LFAAOliveSt- South Bend1ROw ENGINEERINGIOlive St South Bend- 12.2 -11.1 -REVISED SCOPE.docx <br />4275 North High School Road Indianapolis, Indiana 46254 <br />(317) 293-3542 Tel (317) 293-4737 Fax <br />www.vsengineering.com <br />