Laserfiche WebLink
E. Send out survey notices together with questionnaires (if applicable) to all property owners <br />within the project area. All survey notices and questionnaires shall be approved by Client <br />prior to distribution. <br />F. Establish Primary Horizontal Control within the project limits such that the survey base <br />line(s) can be re-established during construction. A local ground coordinate system will be <br />established and tied to the East Zone of the Indiana State Plane Coordinate System, <br />NAD83(2011) per the INDOT Survey Manual. <br />G. Tie in the survey base lines to available USPLSS section comers and/or existing <br />property/right-of-way monumentation. All necessary section corners will be located or re- <br />established to adequately define property lines along the limits of the project during the <br />Right-of-way Engineering or Easement Acquisition phase. <br />H. Re-establish existing roadway alignments from plans for previous projects. <br />Plot right-of-way and property lines based on observed physical evidence and record <br />documents acquired from local government agencies. <br />J. Prepare and record a Location Control Route Survey Plat depicting existing alignments, <br />right-of-way. Property lines and owner information for adjoining properties will be shown, <br />but not dimensioned. <br />Note: Items D, E, F, G, H and I will be updated from the initial phase of the project as needed <br />to meet the requirements for completing a Location Control Route Survey per I.A.0 865 Rule 12 <br />and the INDOT Survey Manual. <br />CAVS Work Files\Proposals\LFA\Olive St - South Bend\LCRS_2016\Olive Street - Survey Scope.doc <br />3 of 3 <br />