My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplemental No. 1 to PSA - DLZ Indiana LLC - Bendix Drive
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Supplemental No. 1 to PSA - DLZ Indiana LLC - Bendix Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 2:45:09 PM
Creation date
4/13/2017 10:12:46 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
° ©sign Poe lte. rns <br />Total <br />a. <br />To ogra hicyField p g p Survey <br />$39,000.00 <br />b. IGeotechnicalInvestigation* <br />$19,200.00 <br />c. jProject <br />Management & LPA/INDOT Coordination <br />$10,000.00 <br />d. lRoadway <br />Design and Plans, Including Signing and Pavement Markings <br />$233,400.00 <br />e. <br />Pavement Design Analysis, Hourly Rate * <br />$16,800.00 <br />f. <br />Preparation of Categorical Exclusion (CE-1) <br />$15,000.00 <br />g, <br />IDEM Rule 5 Erosion Control Permit <br />$3,800.00 <br />h. <br />Utility Coordination <br />$15,200.00 <br />i. <br />Storm Sewer Assessment <br />$6,800.00 <br />j. <br />Additional Information for the Environmental <br />$8,900.00 <br />k. <br />Traffic Signal Design and Plans at Bendix Drive and Boland Drive <br />$2,400.00 <br />1. <br />Traffic Signal Modification at Bendix Drive and Sugar Maple <br />Lane/Court <br />$2,400.00 <br />M. <br />Traffic Signal Design and Plans at Bendix Drive and Nimtz Parkway <br />$9,000.00 <br />n. <br />Detail Curb Ramps <br />$4,700.00 <br />o. <br />Plan Modifications for Alternate Bid Pavement <br />$8,000.00 <br />p. <br />Evaluation for Adding Sidewalks Along a Four Lane Bendix Drive <br />$8,650.00 <br />q. <br />Evaluation for Adding Sidewalks Along a Three Lane Bendix Drive <br />$9,850.00 <br />r. <br />Conceptual Alignment Alternatives for Three Lane Typical Section <br />$4,500.00 <br />s. <br />Traffic Study <br />$14,000.00 <br />t. <br />Traffic Signal Warrant Analysis (2 @ $1,190), as needed <br />$2,380.00 <br />u. <br />Landscape Design and Plans <br />$12,000.00 <br />v' <br />Abandoned Design and Plans for Stage 2 and 15% of Stage 1 and PFC <br />Plans <br />$36,520.00 <br />R/W Engineering <br />Last Deed of Record (8 @ $50) <br />$400.00 <br />W. <br />R/W Engineering and Descriptions (10 descriptions @ $950 <br />Temporary Parcels Only) <br />$9,500.00 <br />R/W Staking (7 @ $550) <br />$3, 850.00 <br />APA (7 @ $250) <br />$1,750.00 <br />$15,500.00 <br />x• <br />g }Y'x <br />r� 1 <br />Bid Phase Services, Pre -Construction Conference, Construction <br />Phase Office Services, Hourly Rate* <br />�� _ '�,x�i` y{''.o- I <br />'23' - kS °.�'"3^"'>° SE £{ <br />5, 000.00 <br />* Items A.2.b., e. and x. will be invoiced an an hourly rate basis, as defined below, and/or as <br />reimbursable/Subconsultant Items. The amounts are estimated only, and the final amount <br />shall not exceed their respective amounts, without prior written approval from the LPA, in <br />accordance with Section V1, paragraph 6 of this Agreement and/or a subsequent approved <br />amendment to the Agreement. If a right of way acquisition Subconsultant is utilized, the <br />CONSULTANT shall receive as payment the actual cost incurred by the CONSULTANT. <br />XXV. Amendment: <br />10 of 13 <br />Supplemental Agreement No. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.